Prioritization of affecting factors on risk management on IT in electronic banking by using fuzzy topsis.

Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 370

This Paper With 13 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

EHCONF04_284

تاریخ نمایه سازی: 6 اردیبهشت 1396

Abstract:

The proper relationship between financial systems and the production of any country considered as the most important factors for economic development. Banks as the main part of the financial system, have the essential role in providing the manufacturing, business and consumer. The key to success ofbanks is knowledge of requirements and the behavior of customers and meet the expectations of customers about the quality of service. So identification and study of factors affecting the adoption Internet Banking in order to reduce the risk of rejection by customers for electronic banking management is crucial. Project risk management, is warning system for impending trouble that solutions are needed and disappear. Therefore, in the ahead research introducing factors influencing IT risk management in electronic banking, ranking these factors according to the survey – descriptive bank of Interest Free Loan Mehr in Tehran was discussed. In order to achieve to the purpose of thesurvey first information required of area by using existing data sources and overviews with relevant experts collected and in continue By applying multi-criteria assessment approach and in particular through the process of fuzzy topsis discussed to evaluation, data analysis. Research results suggeststhe fact that 5 factors data integrity, internal control, access systems, security and technology, are Most important factors on factors affecting on risk management IT in electronic banking. Therefore, in this study, with the Fuzzy Topsis rate these factors and measure their effectiveness in electronic bank.

Keywords:

Authors

Shahram shahbazi

Department of IT, Electronic Branch, Islamic Azad University, Tehran, Iran

Alireza mahini

Department of IT, Electronic Branch, Islamic Azad University, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Khorshid, S., Ghaneh, H. (1388) "ranking using TOPSIS electronic banking ...
  • Soleimani, R., (1391), Evaluation of operational risks in electronic banking, ...
  • Shanian, A. (1385) "Application of multi-criteria deci sion-making techniques to ...
  • Taherkhan, M., (1386) "Application of TOPSIS in prioritizing the location ...
  • Ali Ahmadi, Alireza Jafari -Eskandari, Meysam, Khaleghi, GH, Rshtbry, _ ...
  • Mohammadi, Fatemeh, Afsar, Amir, Taghizadeh, J., Dehnavi Bagheri, M. (1391) ...
  • Akinci, S. , Aksoy, S .Atilgan, E. , (20 10), ...
  • Cao, X.. (2006). "A Cross culture study of risk management ...
  • Chen, S. J., & Hwang, C. L (1992).Fuzzy Multiple Attribute ...
  • Chorafas, Dimitris N. (2014). Operational Risk Control with Basel II. ...
  • Cornalba, Chiara., Giudici, Paolo. (2014)، Statical Mode for Operational Risk ...
  • Dey P.K., and Kinch J., (2008) "Risk management in information ...
  • -Gremler, D. D., Gwinner, K. P., _ W. Brown (2011) ...
  • Herrera, F., Herrera-Vi edma, E.)2000(Linguistic decision analysis: steps for solving ...
  • Hwang, C.L., Yoon, K., (1981). Multiple Attribute Decision Making Methods ...
  • Jarrow, Robert A. (2012). "Operational risk." Journal of Banking & ...
  • L.King, Jack. (2011). Operational Risk Measuremet and Modeling. USA : ...
  • Loader, David. (2010). Managing a key component of operational risk ...
  • Marchewka, J. T., (2003). "Information Technology Project Management". Providing Measurable ...
  • Muermann, Alexander. Oktom, Ulku. (2012)The Near-Miss Management of Operational Risk ...
  • Pennathur, Anita K. (2011). 2 e-Risk Management for Banks in ...
  • Saaty, T.L.) 1995 ("Transport planning with multiple criteria: the Analytic ...
  • Serafim, Opricovic & Gwo-Hshiung Tzeng(2004) Compromise Solution by MCDM Methods: ...
  • Seyedhoseini, S.M., Hatefi, M.A., Two-Pillar Risk Management (TPRM), (2009): A ...
  • Wahlstrom, Gunnar. (2013). _ Worring but Accepting New Measurement, the ...
  • Zadeh, L.A.(1975), The concept of linguistic variable and its application ...
  • نمایش کامل مراجع