REDUCE OF THREATING RISKS IN CIVIL PROJECTS BY USING EPC

Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 369

This Paper With 23 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

NCCPM03_210

تاریخ نمایه سازی: 19 خرداد 1396

Abstract:

Risks can over flow during performance of each project phases. Each project also should be of an appropriate profitable in addition to ability of debt pay. Existence of different risks can influence the project financial flows which lead to liquidity shortage providing lack of control and of this liquidity shortage is to the extent that can not pay creditors demands, the project is failed. Therefore, the risk analysis is a very important factor in success and put through the project. In this paper, first all risks related to the project are divided to three general classifications, risks before the project finish, risks after the project finish and common risks in each two steps, and then for management of each of these risk classifications is presented check strategies and or the risk elimination by emphasis on EPC contracts.

Authors

Seyed Mojtaba Tabatabaei Fard

Department of technical and vocatinal university, alborz, Iran