RISK IDENTIFICATION AND REDUCE THE DELAY CONSTRUCTION PROJECTS

Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 361

This Paper With 23 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

NCCPM03_211

تاریخ نمایه سازی: 19 خرداد 1396

Abstract:

Research represent rising of direct and indirect expenses of accidents due to labor. Report of labor international organization represents possibility of prevention of %98 accidents due to labour in the world, hence, performing risk management process and considering occurrence impact and probability of each events due to inattention to security in addition to project security level gradation, it can prevent to make events that result loss of time and cost and even project quality.

Authors

SEYED MOJTABA TABATABAEI FARD

Department of technical and vocatinal university, alborz, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • C ONS TUCTION LITIGATION _ COST EN GINEERING, 1995. ...
  • RELIAB ILITY EN GINEERING AND SYSTEM SAFETY, 91, 2006, 1071-1082. ...
  • نمایش کامل مراجع