Budget allocation based on the project utility function
Publish place: 14th International Project Management Conference
Publish Year: 1397
نوع سند: مقاله کنفرانسی
زبان: English
View: 475
This Paper With 10 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC14_049
تاریخ نمایه سازی: 17 اردیبهشت 1398
Abstract:
This study presents new approach for allocating the project budget in portfolio. In this approach, initially, multivariate regression is used to extract the project utility function based on key performance indices. Then, Logit model is applied to calculate the initial percentage of budget allocation by considering the project utility value. Finally, visual basic code is developed and the final project budget is obtained. Considering the fact that the value of utility of project may change during the time, the presented approach has the ability to absorb these changes and can be used throughout the lifecycle of the project portfolio. numerical example of Khuzestan steel company developing project portfolio was used to show the performance of this approach.
Keywords:
Authors
Farhad Khazaeli
Phd candidate, Islamic Azad University, Najafabad
MohammadHosien Arman,
Assistant professor, Islamic Azad University, Najafabad
Mohammadreza Zare
Assistant professor, Isfahan university