Assessing shipyard risks in new building projects using hybrid Delphi-FMEA based method

Publish Year: 1397
نوع سند: مقاله کنفرانسی
زبان: English
View: 667

This Paper With 21 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC14_068

تاریخ نمایه سازی: 17 اردیبهشت 1398

Abstract:

Shipbuilding projects are among complex, heavy-resource required types. The amount of financial investment required in these projects make their investors more sensitive about on time delivery. This study aims at implementing hybrid method to investigate ability of group of shipyards in delivering their project on pre-scheduled time. To achieve this, firstly shipbuilding project stages are mapped using Business Process Model and Notation (BPMN 2.0). Then, Delphi method is applied to identify risk factors associated with such stages. Then, following Failure Mode and Effect Analysis (FMEA), severity, occurrence, and detection of risk factors are evaluated, resulting in calculation of priority number for them. That being said, this study sheds light on major risk factors affecting shipbuilding projects delivery among Iranian shipyards. These results effectively can be used to introduce risk mitigating actions for shipyards, and guide for investors to choose more reliably.

Keywords:

Shipbuilding project , Shipyard , Delphi , Failure Mode and Effect Analysis (FMEA) , Risk priority number

Authors

Seyed Hossein Razavi Hajiagha

Management and accounting Faculty, Khatam University, Tehran, Iran

Mohammadreza Rastegar

Karafan Marine Co. Tehran, Iran

Roozbeh Panahi

Department of Civil and Environmental Engineering, Tarbiat Modares University, Tehran, Iran

Farid Taheri

Deputy of Technical and Planning, Iran Marine Industries Fund, Tehran, Iran