Procedures of erecting the overhead contact lines in the Lötschberg base tunnel

Publish Year: 1388
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,290

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICRARE02_121

تاریخ نمایه سازی: 22 اردیبهشت 1389

Abstract:

Challenge: the installation required an extensive special vehicle and machinery outfit as tunnel, a total of 55.2 kilometers of tracks have been erected and equipped with a catenary system. The construction of the overhead contact system was a logistic within the scope of the rail engineering project for the 34.6 km long Lötschberg base well as outstanding installation methods