Procedures of erecting the overhead contact lines in the Lötschberg base tunnel
Publish Year: 1388
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,290
This Paper With 12 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICRARE02_121
تاریخ نمایه سازی: 22 اردیبهشت 1389
Abstract:
Challenge: the installation required an extensive special vehicle and machinery outfit as tunnel, a total of 55.2 kilometers of tracks have been erected and equipped with a catenary system. The construction of the overhead contact system was a logistic within the scope of the rail engineering project for the 34.6 km long Lötschberg base well as outstanding installation methods
Keywords:
Authors
Daniel Wüst
Zürich Kummler +matter company
Jasmin Brändli
Zürich, Kummler +matter company
René Kopp
Zürich, Kummler +matter comapny
Khang chen
۳Zürich, Kummler +matter comapny