CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

The integrated order acceptance, production planning and scheduling problem in a flexible job shop environment

عنوان مقاله: The integrated order acceptance, production planning and scheduling problem in a flexible job shop environment
شناسه ملی مقاله: ICIORS12_231
منتشر شده در دوازدهمین کنفرانس بین المللی انجمن ایرانی تحقیق در عملیات در سال 1398
مشخصات نویسندگان مقاله:

Faezeh Falahati - Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,
Saeed Emami - Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,
Ebrahim Asadi Gangraj - Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,

خلاصه مقاله:
Researchers have considered the integration of short term and mid-term decision-making problems, due to the need for real-worldproduction planning. Nowadays, by increasing in customer-oriented systems and according to production capacities and coordination between manufacturing sector, order acceptance is an important issue. In the past, these problems were considered separately, which led to inconsistencies in production systems and order s delivery. In this paper, the integrated problem of order acceptance, production planning and scheduling in a flexible job shop environment, for the first time, is considered. A novel mixed integer bi-objective mathematical model is proposed for minimizing makespan and maximizing profit. The classic LP-metric and Goal Programming techniques are used to solve the model and make Pareto solutions. A metric indicator of coverage and distance have shown that the L-P metric is a bett er approach for a descriptive example.

کلمات کلیدی:
Order acceptance, production planning; scheduling

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/923690/