Construction of the First Cut-Off Wall by a Low Headroom Cutter inside a Dam Tunnel in China

Publish Year: 1389
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,130

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICGESM04_259

تاریخ نمایه سازی: 18 خرداد 1389

Abstract:

In the South of Sichuan province a 240 MW Yeleh hydroelectric plant was under construction by Sichuan Nanya River Basin Hydraulic Power Development Company Limited, a stateowned enterprise, and China Gezhou Ba Water & Power Group Company Limited. This project sets out to develop the mountain cascade of the Nanya river, a tributary of the Dadu river, provide superior electricity and adjust flood peak & frequency. The specialist contractor Foundation Engineering Company of China Water Resource and Hydropower (FEC) was awarded the contract for foundation treatment at right bank, which included the construction of 75 m deep concrete Cut-Off Wall (COW) inside a 6.0m x 6.5m tunnel. The requirement for 19,317 m3 COW to be constructed in permeable and very dense gravel/cobble formations and a demanding project programme led FEC to adopt Bauer Low Headroom Cutter CBC25/MBC30 in conjunction with Overlap Cutter Joint (OCJ).

Authors

W. G. Brunner

BAUER Maschinen GmbH, Germany

A. Bi

Bauer Technologies Ltd. Taipei, Taiwan

D. Zong

China Water Group, Beijing, China