CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Multi-Period Railway Network Design Model; Arc-based vs. Path-based Modeling

عنوان مقاله: Multi-Period Railway Network Design Model; Arc-based vs. Path-based Modeling
شناسه ملی مقاله: ICRARE06_024
منتشر شده در ششمین کنفرانس بین المللی پیشرفتهای اخیر در مهندسی راه آهن در سال 1398
مشخصات نویسندگان مقاله:

S. Alireza Seyedvakili - PhD candidate, School of Railway Engineering, IUST, Tehran, Iran,
Jabbar-Ali Zakeri - Professor, Centre of Excellence in Railway Transport, School of Railway Engineering, IUST, Tehran,Iran,
S.Masoud Nasr Azadani - Assistant Professor, School of Railway Engineering, IUST, Tehran, Iran,
Yousef Shafahi - Professor, Department of Civil Engineering, Sharif University, Tehran, Iran,
Mohammad Karimi - MSc of Railway Engineering, School of Railway Engineering, IUST, Tehran, Iran,

خلاصه مقاله:
Railway networks are one of the major parts of transportation infrastructure of the countries. Development of this network needs time and capital cost. Having an optimizedplan for yearly investment on improvement of the network is a necessary thing. In this paper, to access a plan to implement development projects in the network and allocate the required budget for a specified period, a multi-period railway network design problem is modeled based on two approach, arc-based and path-based modeling. These models consider development projects (new lines construction and existing lines improvement), available budget in each period, origin -destination demand matrix for each period, block capacity and technical capacity. To show efficiency of the models and comparing these modeling approaches, the Iranian Railway Network is used in different scenarios of demand. The selected projects by the presented models and their usage percentage show the ability and efficiency of the model.

کلمات کلیدی:
Multi-period network design, Arc-based model, Path-based model, Mixed integer programming, Direct and indirect cost

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/982643/