Publisher of Iranian Journals and Conference Proceedings

Please waite ..
Publisher of Iranian Journals and Conference Proceedings
Login |Register |Help |عضویت کتابخانه ها
Paper
Title

A Simultaneous Worker Assignment and Scheduling Problem for Minimizing Makespan in Flexible Flow Shop Via Metaheuristic Approaches

Year: 1398
COI: JR_IJIEPR-30-2_007
Language: EnglishView: 190
This Paper With 18 Page And PDF Format Ready To Download

Buy and Download

با استفاده از پرداخت اینترنتی بسیار سریع و ساده می توانید اصل این Paper را که دارای 18 صفحه است به صورت فایل PDF در اختیار داشته باشید.
آدرس ایمیل خود را در کادر زیر وارد نمایید:

Authors

Fatemeh Bozorgnezhad - MSc student of industrial engineering; Babol Noshirvani University of Technology; Babol; Iran.
Ebrahim Asadi-Gangraj - Assistant professor of industrial engineering; Babol Noshirvani University of Technology; Babol; Iran.
Mohammad Mahdi Paydar - Assistant professor of industrial engineering; Babol Noshirvani University of Technology; Babol; Iran.

Abstract:

In many real scheduling situations, it is necessary to deal with the worker assignment and job scheduling together. However, in traditional scheduling problems, only the machine is assumed to be a constraint, and there is not any constraint about workers. This assumption could, in part, be due to the lower cost of workers compared to machines or the complexity of workers assignment problems. This research proposes a flexible flow shop scheduling problem with two simultaneous issues: finding thebest worker assignment and solving the corresponding scheduling problem. A mathematical model that extends a flexible flow shop scheduling problem is presented to admit the worker assignment. Due to the NP-hardness of the research problem, two approximation approaches based on particle swarm optimization, named PSO and SPSO, are applied to minimize the makespan. The experimental results show that the proposed algorithms can efficiently minimize the makespan; however, the SPSO generates better solutions, especially for large-sized problems

Keywords:

Paper COI Code

This Paper COI Code is JR_IJIEPR-30-2_007. Also You can use the following address to link to this article. This link is permanent and is used as an article registration confirmation in the Civilica reference:

https://civilica.com/doc/992136/

How to Cite to This Paper:

If you want to refer to this Paper in your research work, you can simply use the following phrase in the resources section:
Bozorgnezhad, Fatemeh and Asadi-Gangraj, Ebrahim and Paydar, Mohammad Mahdi,1398,A Simultaneous Worker Assignment and Scheduling Problem for Minimizing Makespan in Flexible Flow Shop Via Metaheuristic Approaches,https://civilica.com/doc/992136

Research Info Management

Certificate | Report | من نویسنده این مقاله هستم

اطلاعات استنادی این Paper را به نرم افزارهای مدیریت اطلاعات علمی و استنادی ارسال نمایید و در تحقیقات خود از آن استفاده نمایید.

Scientometrics

The specifications of the publisher center of this Paper are as follows:
Type of center: دانشگاه دولتی
Paper count: 6,362
In the scientometrics section of CIVILICA, you can see the scientific ranking of the Iranian academic and research centers based on the statistics of indexed articles.

New Papers

New Researchs

Share this page

More information about COI

COI stands for "CIVILICA Object Identifier". COI is the unique code assigned to articles of Iranian conferences and journals when indexing on the CIVILICA citation database.

The COI is the national code of documents indexed in CIVILICA and is a unique and permanent code. it can always be cited and tracked and assumed as registration confirmation ID.

Support