A Theoretical Detailed Analysis for a Proposed 5kW PV Grid-Connected System Installed in Iraq Using PVsyst Tool

Publish Year: 1397
نوع سند: مقاله ژورنالی
زبان: English
View: 549

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJEE-9-2_005

تاریخ نمایه سازی: 20 آبان 1397

Abstract:

In this study, PVsyst simulation software is used to analyze a PV grid tied system in a typical primary school in Iraq. The proposed system is 5kW which is affordable and applicable from the cost and required area points respectively. The monthly averaged electrical load for a typical school is approximately calculated. The system simulation has been done for thirteen Iraqi provinces while it is described and its performance is analyzed in details for Baghdad city as an example. The performance ratio for the system in Baghdad is 0.825 and about 9.82MWh is generated by the system per year, 62.7% is consumed by the load and the remaining is injected to the national grid. The results showed that the initial capital cost is $5,442 which is returned after five and a half years. The cost of 1 kWh if the system operates for 10 years is $0.058. This study clearly demonstrates that photovoltaic power system can effectively assist the peak load on the grid. In addition, these systems are very economical/no maintenance project and can be hooked to any the peak time load.