Crisis management in kill well with drilling relief wells with case study in Iran and the other country
Publish place: 14th International Oil, Gas and Petrochemical Congress
Publish Year: 1389
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,582
This Paper With 9 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IOGPC17_057
تاریخ نمایه سازی: 3 آبان 1389
Abstract:
we know that a kill well with drilling relief well is a one of prevalent process and all of company know a managing this work is a one of hard working . In this article , we try to study managing kind of relief wells and show relief well planning. relief well planning was started as a contingency immediately after the blowoutoccurred with full resources derected to that effort after the second drill pipe kill attempt failed. these design process steps , in generic terms are the following : defining relief well objective , defining kill point s , defining hydraulic communication method, evaluate position uncertainty , evaluate gelogy, define attack angle , develop an electromagnetic ranging strategy , determine surface location s , develop relief well trajectory , define relief well casing program , define survey program evaluate kill hydraulics determine the number of relief wells define kill equipment , and project refinement for drilling and kill. the team was broken into four primary units each with leader.
Authors
ehsan momeni
science and research branch
mohammadhadi parhamvand
science and research branch
seyed abdolnabi panahi
islamic azadi university branch omidieh