Towards Maturity of a Software-based Project Management Methodology Considering a Large-Scale Case Study
Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 261
This Paper With 6 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JAISIS-1-2_004
تاریخ نمایه سازی: 17 فروردین 1400
Abstract:
This paper explores the challenges of designing a project management methodology for a real large-scale enterprise solution. In this methodology, the performance of the classical waterfall approach versus a new hybrid one are examined in practice. In the hybrid methodology, the analysis and deployment steps of creating an enterprise solution are managed through the classical version while the development step is accomplished under the umbrella of a new Scrum-based version of the agile method. It is also shown that the proposed hybrid methodology is accompanied by new challenges such as the necessity to consider modifications in the organizational chart. The results highlight how the hybrid approach outweighs the classical way in practice. It also includes the required maneuvers of implementing the hybrid approach for the involved parties of a large-scale enterprise solution. Finally, the paper provides managerial insight in the context of applied lesson-learned that could illuminate the complicated path of accomplishing an enterprise solution from A to Z for the future researchers and industrial participants.
Authors
Mohammad Emami
MIDHCO Company., Tehran, Iran
Chaiwhan Lim
Smart Convergence Dept, POSCO ICT Co., Pohang-si, South Korea
Amir Mastali
Research Center, FANAP Co., Tehran, Iran
Mohammad Hamidi
Research Center, FANAP Co., Tehran, Iran