Scheduling Project Crashing Time Using Linear Programming Approach: Case Study

Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: English
View: 107

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_RIEJ-6-4_002

تاریخ نمایه سازی: 13 شهریور 1400

Abstract:

In today’s competitive environment completing a project within time and budget, is very challenging task for the project managers. This aim of this study is to develop a model that finds a proper trade-off between time and cost to expedite the execution process. Critical path method (CPM) is used to determine the longest duration and cost required for completing the project and then the time-cost trade–off problem (TCTP) is formulated as a linear programming model. Here, LINDO program is used to determine the solution of the model. To implement the proposed model, necessary data were collected through interviews and direct discussion with the project managers of Chowdhury Construction Company, Dhaka, Bangladesh. The analysis reveals that through proper scheduling of all activities, the project can be completed within ۱۲۰ days from estimated duration of ۱۴۰ days. Reduction of project duration by ۱۷% is achieved by increasing cost by ۳.۷۳%, which is satisfactory.  

Authors

K. Chitra

Department of Industrial and Production Engineering, Jessore University of Science and Technology, Jessore-۷۴۰۸, Bangladesh

P. Halder

Department of Industrial and Production Engineering, Jessore University of Science and Technology, Jessore-۷۴۰۸, Bangladesh

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Pour, N. S., Modarres, M., & Moghadam, R. T. (۲۰۱۲). ...
  • Kelley Jr, J. E. (۱۹۶۱). Critical-path planning and scheduling: Mathematical ...
  • Mobini, M., Mobini, Z., & Rabbani, M. (۲۰۱۱). An Artificial ...
  • Phillips Jr, S., & Dessouky, M. I. (۱۹۷۷). Solving the ...
  • Shouman, М. Л., Abu El-Nour, A., & Elmehalawi, E. (۱۹۹۱). ...
  • Agarwal, A., Colak, S., & Erenguc, S. (۲۰۱۱). A neurogenetic ...
  • Liu, L., Burns, S. A., & Feng, C. W. (۱۹۹۵). ...
  • Hindelang, T. J., & Muth, J. F. (۱۹۷۹). A dynamic ...
  • De, P., Dunne, E. J., Ghosh, J. B., & Wells, ...
  • Arauzo, J. A., Galán, J. M., Pajares, J., & López-Paredes, ...
  • Abbasimehr, H., & Alizadeh, S. (۲۰۱۳). A novel genetic algorithm ...
  • Feng, C. W., Liu, L., & Burns, S. A. (۱۹۹۷). ...
  • Li, H., Cao, J. N., & Love, P. E. D. ...
  • Ponnambalam, S. G., Aravindan, P., & Rao, M. S. (۲۰۰۳). ...
  • Shahsavari-Pour, N., Modarres, M., Tavakoli-Moghadam, R., & Najafi, E. (۲۰۱۰). ...
  • Azaron, A., Perkgoz, C., & Sakawa, M. (۲۰۰۵). A genetic ...
  • Azaron, A., Perkgoz, C., & Sakawa, M. (۲۰۰۵). A genetic ...
  • El Razek, R. H. A., Diab, A. M., Hafez, S. ...
  • Chua, D. K. H., Chan, W. T., & Govindan, K. ...
  • Pathak, B. K., & Srivastava, S. (۲۰۰۷, September). MOGA-based time-cost ...
  • Pathak, B. K., Srivastava, S., & Srivastava, K. (۲۰۰۸). Pathak, ...
  • Chen, W. N., Zhang, J., Chung, H. S. H., Huang, ...
  • Zeinalzadeh, A. (۲۰۱۱). An application of mathematical model to time-cost ...
  • Biswas, S. K., Karmaker, C. L., & Biswas, T. K. ...
  • Mokhtari, H., Aghaie, A., Rahimi, J., & Mozdgir, A. (۲۰۱۰). ...
  • Błaszczyk, T., & Nowak, M. (۲۰۰۹). The time‐cost trade‐off analysis ...
  • Hosseini-Nasab, H., Pourkheradmand, M., & Shahsavaripour, N. (۲۰۱۷). Solving multi-mode ...
  • Su, Z., Qi, J., & Wei, H. (۲۰۱۷). Simplifying the ...
  • Zou, X., Fang, S. C., Huang, Y. S., & Zhang, ...
  • نمایش کامل مراجع