Construction Project Contractors Management Using Analytic Network Process (ANP): A Case for Tehran City

Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 152

This Paper With 11 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JGEO-16-1_003

تاریخ نمایه سازی: 30 آبان 1400

Abstract:

As known the selecting the appropriate contractor is paramount importance to the success of civil projects which is even more important to urban construction projects in various cities. Thus, this study highlights the main criteria for selecting contractors for construction projects in urban area as cases study for Tehran city, Iran. The ۱۹ criteria were identified based on field investigations and expert opinions which classified into six groups. The analytic network process (ANP) was applied on criterias to responses prioritization. According to the results of the assessment, the affordability with ۰.۰۶۶۰ and compliance rate with ۰.۰۵۹۹ importance score are ranked criteria for responses prioritization and selecting the appropriate contractor in Tehran city. The executive ability factor with ۰.۰۱۴۴ score received the lowest attention in ANP model.

Authors

Hamideh Feyzi

Department of Management, Islamic Azad University, Tabriz Branch, Tabriz, Iran

Reza Badrgermi

Department of Management, Faculty of Management, Amirkabir University of Technology, Tehran, Iran