Designing Risk-Management Strategies for Generation Companies
Publish place: 25th International Power System Conference
Publish Year: 1389
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,224
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
PSC25_039
تاریخ نمایه سازی: 24 بهمن 1390
Abstract:
Planning is done through multiple options with uncertainties which do not necessarily pursue the same objectives. Risk and uncertainties are different concepts and can be quantified separately. Short-term tradeoffs between productivity and safety often exist in the operation of critical facilities such as power plants. Gencos experience different uncertainties (financial or physical). This exposes Gencos to risk. So risk management should be a part of their planning process. In this paper a typical power plant is modeled in terms of its different states. Then, the alternative risk management strategies for this plant have been evaluated based on the predicted operating performance and it is shown how a model, coupled with explicit value judgments, can be used to design optimal strategies, e.g., to balance initial costs, long term operations and maintenance costs, and the potential costs of catastrophic failures.
Keywords:
Authors
H Hedayati
Sharif University of Technology Iran
R Salimi
Sharif University of Technology Iran
A Soroudi
Sharif University of Technology Iran
M Ehsan
Sharif University of Technology Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :