Resource Constrained Project Scheduling with Stochastic Resources

Publish Year: 1397
نوع سند: مقاله ژورنالی
زبان: English
View: 201

This Paper With 11 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_APRIE-5-1_004

تاریخ نمایه سازی: 2 دی 1400

Abstract:

Despite the dynamic nature of real life scheduling problems, few studies focus on stochastic resource constrained project scheduling problem and its variants. In this study, we consider stochastic resource possibilities and propose a new chance constraint, piecewise-linear and mixed integer programming model. Model is tested and verified with known project instances. One of the main strengths of the proposed model is it can be used to construct baseline schedules with a predetermined confidence interval. This gives scheduler an opportunity to construct proactive actions in order to minimize disruptions.

Authors

Furkan Uysal

Ministry of Development, Turkey.

Selçuk Kürşat Işleyen

Department of Industrial Engineering, Faculty of Engineering, Gazi University, Ankara, Turkey.

Cihan Cetinkaya

Department of Industrial Engineering, Faculty of Engineering, Gaziantep University, Gaziantep, Turkey.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Blazewicz, J., Lenstra, J. K., & Kan, A. R. (۱۹۸۳). ...
  • Ballestin, F., & Leus, R. (۲۰۰۹). Resource‐Constrained Project Scheduling for ...
  • Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P. K., & ...
  • Wang, Y., He, Z., Kerkhove, L. P., & Vanhoucke, M. ...
  • Lambrechts, O., Demeulemeester, E., & Herroelen, W. (۲۰۰۸). Proactive and ...
  • Valls, V., Laguna, M., Lino, P., Pérez, A., & Quintanilla, ...
  • Wang, L., Huang, H., & Ke, H. (۲۰۱۵). Chance-constrained model ...
  • Uysal, F., Isleyen, S., Cetinkaya, C., & Celik, N. (۲۰۱۵). ...
  • Hartmann, S., & Briskorn, D. (۲۰۰۸). A survey of deterministic ...
  • Kolisch, R., & Sprecher, A. (۱۹۹۷). PSPLIB-a project scheduling problem ...
  • Dadfar, H., & Gustavsson, P. (۱۹۹۲). Competition by effective management ...
  • Williams, T. M. (۱۹۹۲). Practical use of distributions in network ...
  • Golenko-Ginzburg, D., & Gonik, A. (۱۹۹۷). Stochastic network project scheduling ...
  • Shou, Y., & Wang, W. (۲۰۱۲). Robust optimization-based genetic algorithm ...
  • Yang, I. T., & Chang, C. Y. (۲۰۰۵). Stochastic resource-constrained ...
  • Herroelen, W., & Leus, R. (۲۰۰۵). Project scheduling under uncertainty: ...
  • Kis, T. (۲۰۰۵). A branch-and-cut algorithm for scheduling of projects ...
  • Long, L. D., & Ohsato, A. (۲۰۰۸). Fuzzy critical chain ...
  • Schonberger, R. J. (۱۹۸۱). Why projects are “always” late: a ...
  • Golenko-Ginzburg, D., Gonik, A., & Laslo, Z. (۲۰۰۳). Resource constrained ...
  • Li, S., Jia, Y., & Wang, J. (۲۰۱۲). A discrete-event ...
  • Erdogan, S. A., & Denton, B. (۲۰۱۳). Dynamic appointment scheduling ...
  • Charnes, A., & Cooper, W. W. (۱۹۵۹). Chance-constrained programming. Management science, ۶(۱), ...
  • Charnes, A., & Cooper, W. W. (۱۹۶۲). Chance constraints and ...
  • Charnes, A., & Cooper, W. W. (۱۹۶۳). Deterministic equivalents for ...
  • Williams, H. P. (۲۰۱۳). Model building in mathematical programming. John Wiley ...
  • نمایش کامل مراجع