Determination of Critical Cultural Factors In Construction Project
Publish place: 03rd International Project Management Conference
Publish Year: 1386
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,129
This Paper With 13 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC03_092
تاریخ نمایه سازی: 11 شهریور 1385
Abstract:
The concept of cultural capital is becoming more relevant to the construction industry. This concept has been adopted from the manufacturing industry. The extent to which an organization utilizes and nurtures its culture would provide a useful indicator for its success. A research has been conducted to determine the available type of cultural factors, the effect of these cultural factors on the performance and success of construction firms, and evaluate possible positive and negative cultures in the Iranian construction industry. The research involves a questionnaire survey and interviews. This paper reports the findings on the questionnaire survey.
The study covers five dimensions of project control factors, namely quality, cost and profit, schedule, safety and loyalty and relates these factors to eleven cultural factors. Some of the cultural factors are: recognition, project axiology, behavior rule, social environment, project visualization, human resource management, immaterial capital, project culture atmosphere, and job site culture.
Findings indicate that most of the cultural factors were given indicated as very important in the project management. This stirring discovery means the cultural capital has already played a significant role in the current construction project activities. The importance rate of each cultural factor to every project control dimension totally 55 branches will be presented. Therefore, a visual reference for contractors to implement the cultural capital management methods to the real production will be shared. More interestingly, this research also discovered some potential effect from the difference of respondents’ personal characters e.g. religion and the difference of respondents’ working background and after-tax profit to their view of the importance of every cultural factor. Some of the significance rate is much more than the researcher’s expectation.
Keywords:
Authors
Mahmood Hoseiniyan
Dr. Department of construction management and engineering, faculty of civil and environmental engineering,university of Putra Malaysia,Malaysia
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :