A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
Publish place: 08th International Industrial Engineering Conference
Publish Year: 1391
Type: Conference paper
Language: English
View: 1,849
This Paper With 6 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
IIEC08_009
Index date: 27 November 2012
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times abstract
This paper presents a new mathematical model for a hi-objective job shop scheduling problem with sequencedependent setup times that minimizes the weighted meancompletion time and the weighted mean tardiness time. For solving this multi-objective motkl, we develops a fuzzy multiobjectivelinear programming (FMOLP) motkL In this problem, a proposed FMOLP method is applied with respect to the overall acceptable tkgree of the decision maker (DM) satisfaction.Finally, a numerical example demonstrates the feasibility of applying the proposed model to job shop scheduling with set uptimes problem. The proposed model yields a compromised solution and tlte decision maker's overall levels of satisfaction
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times Keywords:
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times authors
Leila Emami
Yazd University
Mohammad bagher fakhrzad
Y azd University