Ethiopian Dam Optimum Hydraulic Operating Conditions to Reduce Unfavorable Impacts on Downstream Countries

Publish Year: 1401
نوع سند: مقاله ژورنالی
زبان: English
View: 51

This Paper With 14 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_CEJ-8-9_011

تاریخ نمایه سازی: 1 اردیبهشت 1403

Abstract:

As noted by several researchers, the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile River is expected to have unfavorable consequences for downstream countries like Egypt and Sudan. To limit GERD's negative effects on downstream countries, its operation should be secure, and its upstream water level should be ideal. However, none of the studies carried out the ideal operating scenarios from the perspective of controlling the number of gate openings. Accordingly, this study evaluates the optimal operating scenarios of the GERD and its impact on downstream countries by adopting a mathematical model to analyze the number of gates that can be opened and the depth of opening during different filling years. The paper also presents an environmental impact assessment of some GERD significant factors during construction, filling, and operation, with the goal of developing a mitigation strategy. The results showed that opening ۵ gates at ۴.۵۶ m over a ۱۰-year filling period would be the safest, most accepted, and most advantageous for Ethiopia and downstream countries. Moreover, creating a water-saving management plan in Egypt to overcome GERD's negative impacts would cost ۸۷۷ billion Egyptian pounds. Doi: ۱۰.۲۸۹۹۱/CEJ-۲۰۲۲-۰۸-۰۹-۰۱۱ Full Text: PDF

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Abtew, W., Dessu, S.B. (2019). Grand Ethiopian Renaissance Dam Analysis. ...
  • Abdel-Shafy, H., & Aly, R. (2002). Water issue in Egypt: ...
  • Sharaky, A.M., Hamed, K.H., Mohamed, A.B. (2017). Model-Based Optimization for ...
  • Oestigaard, T. (2010). Nile issues: small streams from the Nile ...
  • Suter, M. (2016). The Politics of Water: What We Know ...
  • El-Askary, H., Fawzy, A., Thomas, R., Li, W., Lahaye, N., ...
  • Andualem, T. G., Kassa, M., Getachew Demeke, G., Hewa, G., ...
  • Mohamed, H. I. (2017). Grand Ethiopian Renaissance Dam Impact on ...
  • Mulat, A. G., & Moges, S. A. (2014). Assessment of ...
  • Keith, B., Epp, K., Houghton, M., Lee, J., & Mayville, ...
  • Abtew, W., Dessu, S.B. (2019). Grand Ethiopian Renaissance Dam Reservoir ...
  • El Baradei, S. A., Abdelkader, S. E., & Hussein, N. ...
  • Heggy, E., Sharkawy, Z., & Abotalib, A. Z. (2021). Egypt’s ...
  • Abou Samra, R. M., & Ali, R. R. (2021). Detection ...
  • Kansara, P., Li, W., El-Askary, H., Lakshmi, V., Piechota, T., ...
  • Wheeler, K. G., Jeuland, M., Hall, J. W., Zagona, E., ...
  • Baker, N. J., Boubée, J., Lokman, P. M., & Bolland, ...
  • Esler, J. G., Rump, O. J., & Johnson, E. R. ...
  • El Baradei, S. A., Imam, E. H. (2011). Optimum operating ...
  • AbuZeid, K. (2020). GERD & Ethiopian Water Resources: Is it ...
  • Bárdossy, A., & El Hachem, A. (2021). Assessment of Water ...
  • El-Nashar, W. Y., & Elyamany, A. H. (2018). Managing risks ...
  • Ahmed, A. T., & Elsanabary, M. H. (2015, March). Hydrological ...
  • Aziz, M. (2020). Egypt’s water challenges: Beyond the dam saga. ...
  • Ferguson, D. (2014). Greywater systems: can they really reduce your ...
  • Kadry, A. (2022). Ambitious desalination plans. Ahram Online website. Available ...
  • Miguelez, C. (2021). How Much Does It Cost to Install ...
  • نمایش کامل مراجع