Flow shop scheduling under Time-Of-Use electricity tariffs using fuzzy multi-objective linear programming approach

Publish Year: 1400
نوع سند: مقاله ژورنالی
زبان: English
View: 42

This Paper With 13 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JMMO-9-2_005

تاریخ نمایه سازی: 19 خرداد 1403

Abstract:

Given the reduction of non-renewable energy resources and increase of energy costs during  recent years, developing an efficient scheduling model considering energy consumption is necessary in manufacturing systems. This paper is dedicated to flow shop scheduling problem under Time-Of-Use electricity tariffs. In this regard, a bi-objective mixed-integer programming model is formulated for the problem. Two objectives, namely, the minimization of the total electricity cost and the sum of earliness and tardiness of jobs, are considered simultaneously. The bi-objective model is converted into an equivalent single objective linear programming model using fuzzy multi-objective programming approach. The CPLEX solver in GAMS software is used to solve the proposed model for an instance. The numerical example shows that the proposed model is reasonable and applicable.

Authors

Seyed Amin Badri

Department of Industrial Engineering, Faculty of Technology and Engineering, East of Guilan, University of Guilan, Rudsar-Vajargah, Iran

Allahyar Daghbandan

Department of Chemical Engineering, Faculty of Engineering, University of Guilan, Rasht, Iran

Zahra Aghabeiginiyay Fatalaki

Department of Industrial Engineering, Kooshyar higher education institute, Rasht, Iran

Mohammad Mirzazadeh

Department of Engineering Sciences, Faculty of Technology and Engineering, East of Guilan, University of Guilan, Rudsar-Vajargah, Iran