Explanation of construction and risk management in mass housing (Case study: Tehran province construction projects)

Publish Year: 1403
نوع سند: مقاله ژورنالی
زبان: English
View: 30

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJNAA-15-8_018

تاریخ نمایه سازی: 20 خرداد 1403

Abstract:

This study evaluated the effect of three factors of project, construction, and risk management on the time, cost, and execution process of the projects based on a case study regarding building mass construction projects. This survey study was conducted on ۱۵۰ professors, experts, and contractors in the field of housing mass construction in Tehran province. A total of ۱۰۸ people were selected as a statistical sample by determining the sample size of Morgan's table by simple random method. The data collection tool is through a questionnaire, the validity of which has been evaluated based on the opinion of professors' experts and its reliability based on Cronbach's alpha coefficient. Cronbach's alpha was ۰.۸۲, indicating the research tool's appropriate reliability. In this research, different descriptive and inferential statistical methods were used to analyze the data using SPSS software to classify the characteristics of the respondents and the statistical population. Cronbach's alpha test was used to check the reliability of the questionnaire, and tests, including the Kolmogorov-Smirnov test were utilized to check the normality of the data distribution and the sample t-test. The results showed that mass housing projects have more risks than normal constructions. Contrary to the fact that mass construction projects with high importance are in the first rank, mass construction projects with low importance were in the first rank, and after that, high and medium projects were in the second and third ranks, respectively.

Authors

Seyed Mohammad Hoseini Rad

Department of Civil Engineering and Construction Management, University of Science and Technology, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • A.F. Almeida, X. Ferrada, R. Howard and L. Rubio, Risk ...
  • A. Angour, P. Jiayin and T. Zayed, Assessing risk and ...
  • S.H. Azimi Amoli and M.H. Khosravi Largan, Investigating the environmental ...
  • C. Fang and F. Marle, A simulation-based risk network model ...
  • P.V. Ingle and G. Mahesh, Construction project performance areas for ...
  • J. Jia, J. Sun, Z. Wang and T. Xu, The ...
  • L. Liang, Small project benchmarking, PhD Thesis, The University of ...
  • S. Marcelino-Sadaba, A. Perez-Ezcurdia, A.M. Echeverrıa Lazcano and P. Villanueva, ...
  • N. Mihajlovic and M. Apostolovska, Analysis of project success in ...
  • A. Mills, A systematic approach to risk management for construction, ...
  • O. Pablo, P. Santiago and O. Jorge, Proposal of performance ...
  • A. Ravansar and R. Mirzaei, The effect of economic factors ...
  • F. Sherratt, S. Sherratt and C. Ivory, Challenging complacency in ...
  • F. Shirazi, Provide a model for managing claims regarding the ...
  • A. Shokrgozar and G. Rezaeipour, An analysis of the role ...
  • J. Silvati, Application of fuzzy-based decision-making methodology to construction project ...
  • M. Taghipour, M. Zakai Ashtiani and M.H. Dadpour, Identification of ...
  • Z. Zhang, W. Li and J. Yang, Analysis of stochastic ...
  • نمایش کامل مراجع