An Identification and prioritization of factors causing delays in ICT projects based on PMBOK standards using Fuzzy Delphi & Fuzzy Delphi hierarchical analysis
Publish place: International Journal of Applied Research in Management, Economics and Accounting، Vol: 1، Issue: 1
Publish Year: 1402
نوع سند: مقاله ژورنالی
زبان: English
View: 26
This Paper With 21 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJMEA-1-1_003
تاریخ نمایه سازی: 23 خرداد 1403
Abstract:
Due to the importance of Information and Communication Technology (ICT) projects and lack of research on such projects in the petroleum industry, the present study mainly aimed to identify and prioritize the factors affecting the delay of ICT projects in Masjid-i-Solieman Oil and Gas Production Company as the case study. This investigation seeks the causes of undesirable conclusions of the ICT petroleum industry. The results are crucial to prevent the wastage of financial resources or time (due to sanctions and the difficulty of supply resources in Iran), also are very important for the project management of the oil and gas industry. On the other hand, it can be helpful all over the world.According to the obtained prioritization, the most significant impact was the wrong sequence and definition of prerequisite relationships, prioritization instructions and lack of review of the priority in allocating limited resources to project components, and lack of timely allocation of financial resources, respectively, with the highest importance.Due to the importance of Information and Communication Technology (ICT) projects and lack of research on such projects in the petroleum industry, the present study mainly aimed to identify and prioritize the factors affecting the delay of ICT projects in Masjid-i-Solieman Oil and Gas Production Company as the case study. This investigation seeks the causes of undesirable conclusions of the ICT petroleum industry. The results are crucial to prevent the wastage of financial resources or time (due to sanctions and the difficulty of supply resources in Iran), also are very important for the project management of the oil and gas industry. On the other hand, it can be helpful all over the world. According to the obtained prioritization, the most significant impact was the wrong sequence and definition of prerequisite relationships, prioritization instructions and lack of review of the priority in allocating limited resources to project components, and lack of timely allocation of financial resources, respectively, with the highest importance.
Keywords:
Project management , Delay , Fuzzy Delphi technique Analytical Hierarchy Process (FDAHP) Approach , ICT project
Authors
Seyed Saman Mirabdali
Department of Industrial Engineering, Islamic Azad University of Masjid-i-Solieman, Iran
Reza Soltani
Department of Industrial Engineering, Islamic Azad University of Masjid-i-Solieman, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :