GIS-based Optimal Route Selection for Oil and Gas Pipelines in Uganda

Publish Year: 1394
نوع سند: مقاله ژورنالی
زبان: English
View: 462

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_ACSIJ-4-4_014

تاریخ نمایه سازی: 7 آذر 1394

Abstract:

The Ugandan government recently committed to development of a local refinery benefiting from recently discovered oil and gas reserves and increasing local demand for energy supply. Theproject includes a refinery in Hoima district and a 205 kilometre pipeline to a distribution terminal at Buloba, near Kampala city.This study outlines a GIS-based methodology for determining an optimal pipeline route that incorporates Multi Criteria Evaluationand Least Cost Path Analysis. The methodology allowed for an objective evaluation of different cost surfaces for weighting the constraints that determine the optimal route location. Fourcriteria (Environmental, Construction, Security and Hybrid) were evaluated, used to determine the optimal route and comparedwith the proposed costing and length specifications targets issued by the Ugandan government. All optimal route alternatives werewithin 12 kilometres of the target specification. The construction criteria optimal route (205.26 km) formed a baseline route for comparison with other optimal routes.

Authors

Dan abudu

Faculty of Engineering and Science, University of Greenwich, Chatham, ME۴ ۴TB, United Kingdom

Meredith Williams

Centre for Landscape Ecology and GIS, University of Greenwich, Chatham, ME۴ ۴TB, United Kingdom