Investigation and ranking of effective factors on delay inbridge construction projects using the AnalyticHierarchy Process (AHP)

Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 905

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICICA01_0176

تاریخ نمایه سازی: 27 اسفند 1394

Abstract:

Today, a large part of each country’s capital, especially in developing countries, allocates to the construction and infrastructure projects. The main problem that most of big projects are faced with is delays in different phases of the project and eventually the delay on meeting the project’s final deadline. Because of having favorable geographical position, Babolsar city in Mazandaran Province are faced with high demand for construction and high volume of tourists. At present, four major bridge construction projects are being carried out to facilitate traffic throughout the city. These projects are faced with delays and as a result with additional costs. After collecting reasons for delay in projects, designing exploratory questionnaires and using Analytic Hierarchy Process (AHP) on factors effective on delay in projects as well as by weighting factors by experts, it was found that economic factors have had the greatest impact on delays

Keywords:

project , Analytic Hierarchy Process (AHP) , bridge construction , delay

Authors

Seyed Mostafa Shabanian

Departmant of civil engineering, Babol Noshirvani University of Technology

Mehdi Mohseni

Departmant of civil engineering, Allameh Mohaddes Nouri University,

Alireza Mirzagoltabar

Departmant of civil engineering, Babol Noshirvani University of Technology

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Technical Affairs Deputy, Office of Monitoring and Evaluation of Plans, ...
  • Molayi, F. (1388), "Investigating reasons for delays in construction projects: ...
  • Vatankhah, A. (1382), "Investigating reasons for delays in construction projects". ...
  • Faridi, AS.S. and el-Sayegh, S.M, (2006), "significant factors causing in ...
  • نمایش کامل مراجع