Application of Carbofol® Tunnel Membrane Sealing System DWA-I in the Swedish Hallandsås Tunnel
Publish place: 08th Iranian Tunneling Conference
Publish Year: 1388
نوع سند: مقاله کنفرانسی
زبان: English
View: 3,039
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ITC08_078
تاریخ نمایه سازی: 2 آذر 1387
Abstract:
A very important segment of the West coast railway extension is the tunnel project through the Hallandsهs. Due to extremely difficultgeological conditions, the originally conceived tunnel construction design, with the idea to use a TB-Machine had to be changed. The tunnel is now drifted heading by blasting. An extensive narrow gapand crack system crosses the ridge of the Hallandsهs and complicates the injection works. After problematical trials to seal the rock against penetrating groundwater by chemical injection methods, now the project is continued by lining a test section of 2 × 500 m. Main component of this sealing system is a 4 mm Carbofol® Tunnel Membrane, which is designed for a water column of 150 m.
Keywords:
Authors
A Shahkolahi
Head of Tunnel Sealing System, Windavar Co. PJS, Local Partner of NAUE GmbH & Co. KG, Iran
M Meissner
Head of Tunnel Sealing System, NAUE GmbH & Co. KG, Germany
H Ghiasinejad
Geosynthetics Design Expert, Local Partner of Bauberatung Geokunststoffe GmbH & Co. KG (BBG Consulting Engineers, Germany), Iran Abstract
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :