Waterborne Construction of Rubble Mound Breakwaters

Publish Year: 1385
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,054

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICCE07_563

تاریخ نمایه سازی: 29 دی 1384

Abstract:

Breakwaters are wall-shape structures preparing lee side calmness through wave reflection and dissipation(due to diffraction).This calm basin are used in different aspects among them are : mooring , berthing, loading ,unloading and secure operation of vessels and harbor facilities protection. Improving harbor entrance conditions to control sediment transport process is another goal of breakwater execution.Construction costs are remarkably affected by environmental factors mainly referred to as: water depth, weather conditions and sea-bed features.Depending on the situation, breakwaters are commonly erected in two distinct ways: waterborne & land-based. Apart from advantages and disadvantages of either ways, selection of execution method is strongly dependent on some parameters like: operation and commissioning deadlines (as client wishes) and site specific problems .Site position and special condition of each project can either make or solve many construction cost problems. In this paper significant features of land-based and waterborne erection of such structures have been compared .Construction rocedure of Pars Petrochemical Project as a case history of paper and a new experience in Iran (Assaluyeh Port) has been addressed in detail as well as comparing method statement with common construction aspects referred to in the literature of practice. Finally Some useful recommendations will be given in concluding remarks.

Authors

Roohollah Roohollah

M.Sc. Coastal Structures, Ghorb Khatam (Nooh)

Mojtaba Ghanbarian

B.Sc.Civil Engineering, Ghorb Khatam(Nooh)

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Practical experiences in Pars Petrochemical Port Project. ...
  • "Manual on the use of Rock in Hydraulic Engineering" , ...
  • Directorate - General for public works and Water Management. CRWS. ...
  • _ Construction of Offshore Structures ", Ben C .Gerwick, Jr. ...
  • "Port Engineering", Volume 2, fourth edition , Per Bruun, 1994. ...
  • "Design and Construction of ports and Marine Structures", Alonzo Def.Quinn ...
  • نمایش کامل مراجع