سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Publish Year: 1387
Type: Journal paper
Language: English
View: 378

This Paper With 12 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

JR_JOIE-2-4_001

Index date: 13 November 2018

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem abstract

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem Keywords:

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem authors

Bahadorgholi Aryanezhad

Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran

Mehdi Karimi-Nasab

Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran

Seyed Mohammad Taghi Fatemi Ghomi

Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran