Solving economic lot scheduling problem using extended basic period approach with deteriorating items
Publish place: 7th International Industrial Engineering Conference
Publish Year: 1389
Type: Conference paper
Language: English
View: 2,928
This Paper With 6 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
IIEC07_067
Index date: 28 May 2010
Solving economic lot scheduling problem using extended basic period approach with deteriorating items abstract
In this paper, we study economic lot scheduling problem (ELSP) in production environments with slack costs and deteriorating items using the extended basic period approach under Power-of-Two (PoT) policy. Our goal in this research is determining an optimal batch size for a product and minimizing total related costs to such a problem. The ELSP is concerned with the scheduling decision of n items and lot sizing. Also PoT policy ensures that the replenishment cycle of each item to be integer.
Solving economic lot scheduling problem using extended basic period approach with deteriorating items Keywords:
Solving economic lot scheduling problem using extended basic period approach with deteriorating items authors
Mostafa Zandieh
Department of Industrial Management, Shahid Beheshti University
Vahid Kayvanfar
Department of Industrial Engineering,Mazandaran University of Science and Technology
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :