سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Solving economic lot scheduling problem using extended basic period approach with deteriorating items

Publish Year: 1389
Type: Conference paper
Language: English
View: 2,928

This Paper With 6 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

IIEC07_067

Index date: 28 May 2010

Solving economic lot scheduling problem using extended basic period approach with deteriorating items abstract

In this paper, we study economic lot scheduling problem (ELSP) in production environments with slack costs and deteriorating items using the extended basic period approach under Power-of-Two (PoT) policy. Our goal in this research is determining an optimal batch size for a product and minimizing total related costs to such a problem. The ELSP is concerned with the scheduling decision of n items and lot sizing. Also PoT policy ensures that the replenishment cycle of each item to be integer.

Solving economic lot scheduling problem using extended basic period approach with deteriorating items Keywords:

Economic lot scheduling problem , Deterioration , Imperialist competitive algorithm

Solving economic lot scheduling problem using extended basic period approach with deteriorating items authors

Mostafa Zandieh

Department of Industrial Management, Shahid Beheshti University

Vahid Kayvanfar

Department of Industrial Engineering,Mazandaran University of Science and Technology

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
Yao, M. J., and Huang, j. X., "Solving the economic ...
Yao, M. J., and Elmaghraby, S. E., "The Economic Lot ...
Elmaghraby, S. E., "The economic lot scheduling problem (ELSP): review ...
Soman, C. A., Van Donk, D. P., and Gaalman, G., ...
Brander, P., and Segerstedt, A., "Economic lot scheduling problems incorporating ...
Eilon, S., "Economic batch size determination for multiproduct scheduling", Operational ...
Maxwell, W.L, "The scheduling of economic lot sizes", Naval Research ...
Bomberger, E., "A dynamic programming approach to a lot scheduling ...
Lopez, M. A., and Kingsman, B. G., "The economic lot ...
Balkhi, Z., and Benkherouf, L., " A production lot size ...
Atashpaz, E., and Lucas, C., "Imperialist Competitive Algorithm: An Algorithm ...
Khabbazi. A., Atashpaz. E., and Lucas. C., "Imperialist competitive algorithm ...
نمایش کامل مراجع