A Novel Heuristic Approach for Multimode Resource Constrained Project Scheduling Problems
Publish place: 16th Iran International Industrial Engineering Conference
Publish Year: 1398
نوع سند: مقاله کنفرانسی
زبان: English
View: 241
This Paper With 12 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC16_322
تاریخ نمایه سازی: 12 مرداد 1399
Abstract:
Multimode project scheduling problem has significant application in project-based organizations. It is NP-hard (Non-Polynomial) problem and therefore, several heuristic and meta heuristic techniques are employed in literature to solve these problems. Current research proposes a novel heuristic approach for multimode resource constrained project scheduling (MMRCPS). The suggested heuristic introduces some efficient techniques which simultaneously optimizes the resource utilization and activity mode selection. The heuristic is designed for makespan minimization. Furthermore, it incorporates certain activity shifting techniques which reduces makespan of the project. The proposed heuristic is tested on benchmark instances taken from PSPLIB (Project scheduling problem library) and a comparison is performed against optimal results. The proposed heuristic gives competent results on comparison with optimal results in literature.
Keywords:
Authors
Mazhar Ali
Research Associate, University of Engineering and Technology Taxila, Pakistan;
Saif Ullah
Asistant Professor, University of Engineering and Technology Taxila, Pakistan;