Productivity Improvement through Line Balancing by Using Simulation Modeling

Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 302

This Paper With 13 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JOIE-13-1_013

تاریخ نمایه سازی: 3 اردیبهشت 1399

Abstract:

The typical problems facing garment manufacturers are long production lead time, bottlenecking, and low productivity. The most critical phase of garment manufacturing is the sewing phase, as it generally involves a number of operations or for the simple reason that it’s labor intensive. In assembly line balancing, allocation of jobs to machines is based on the objective of minimizing the workflow among the operators, reducing the throughput time as well as the work in progress and thus increasing the productivity. Sharing a job of work between several people is called division of labor. Division of labor should be balanced equally by ensuring the time spent at each station approximately the same. Each individual step in the assembly of product has to be analyzed carefully, and allocated to stations in a balanced way over the available workstations. Each operator then carries out operations properly and the work flow is synchronized. In a detailed work flow, synchronized line includes short distances between stations, low volume of work in process, precise of planning of production times, and predictable production quantity. This study deals with modeling of assembly line balancing by combining both manual line balancing techniques with computer simulation to find the optimal solution in the sewing line of Almeda textile plc so as to improve productivity. In this research arena software, is employed to model and measure the performance of the existing and proposed sewing line of the federal police trousers sewing line model. For each operation, the researchers have taken 15 sampling observations using stopwatch and recorded the result. All the collected data are statistically analyzed with arena input analyzer for statistical significance and determination of expressions to be used to the simulation modeling; SAM is also calculated for these operations to be used to the manual line balancing. An existing systems simulation model is developed and run for 160 replications by the researchers to measure the current performance of the system in terms of resource utilization, WIP, and waiting time. The existing systems average utilization is 0.53 with a line efficiency of 42%. This study has developed a new Sewing assembly line model which has increased the system utilization to 0.69 at a line efficiency of 58.42% without incurring additional cost.

Authors

Aregawi Yemane

Industrial Engineering, Faculty of mechanical and Industrial Engineering , Bahirdar University ,Bahirdar , Ethiopia

Gebremedhin Gebremicheal

Industrial Engineering, Faculty of mechanical and Industrial Engineering , Bahirdar University ,Bahirdar , Ethiopia

Teklewold Meraha

Industrial Engineering, Faculty of mechanical and Industrial Engineering , Bahirdar University ,Bahirdar , Ethiopia

Misgna Hailemicheal

Industrial Engineering, Faculty of mechanical and Industrial Engineering , Bahirdar University ,Bahirdar , Ethiopia

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Amardeep, J. & Gautham, J. (2013). Line Balancing of Single ...
  • Amen, M. (2000). Heuristic methods for cost-oriented assembly line balancing. ...
  • Ashkan, H., Hamid, K., & Hesam, R. (2014.). Line balancing ...
  • Bahadir, & Senem, K. (2013). Assembly line balancing in garment ...
  • BGMEA’s Chittagong unit. (2009). Quality and Productivity Management in perspective ...
  • Bobby, J., & Jenson,  J. (2013). analysis and simulation of ...
  • Bon, A. T., Rahman, A. A., Bolhassan, E., & Nordin, ...
  • Bose, T. K. (2012). Application of Fishbone Analysis for Evaluating ...
  • Breginski, R., Cleto, M., & Junior, J. S. (2013). Assembly ...
  • Chan, G., Hui, K., & Yeung, K. (1998). Handling the ...
  • Chen, J. C., Chen, C.-C., Su, L.-H., Wu, H.-B., & ...
  • Dwijayanti. (2010). A proposed study on facility planning and design ...
  • Elanchezhain, K.  & Vijaya, R. (2008). Production planning and control. ...
  • Farhatun, N. (2016). Improving sewing section efficiency through utilizing worker ...
  • Fukishini, T., & yamagata, T. (2014). The garment industry in ...
  • Kanawaty, G. (1992). Motion and Time study. Geneva: International labour ...
  • Kelton, D. (2006). Simulation with arena. Boston: Mc Graw Hill. ...
  • Khan, I. (2013). Minimization of Reworks in Quality and Productivity ...
  • Khatun. (2016). Application of I.E in the industry for better ...
  • Kumar, N., & Mahto, D. (2013). Assembly Line Balancing: A ...
  • Kumar, N., & Mahto, D. (2013). Productivity Improvement through Process ...
  • Labour management in development . (2001). Labour management in development ...
  • Mahto, D., & Kumar, A. (2008). Application of Root Cause ...
  • نمایش کامل مراجع