Simulation and Optimization of Multiple Bit Runs to minimize cost per foot
Publish place: 14th International Oil, Gas and Petrochemical Congress
Publish Year: 1389
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,491
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IOGPC17_093
تاریخ نمایه سازی: 3 آبان 1389
Abstract:
weight on bit , rotary speed , bit hydraulics and more importantly bit types , are the most important parameters affecting rate of penetration and consequently the economics of drilling . Pulling a worn bit is necessary to make the drilling operations more efficient. cost per foot calculation is a popular criterion used to predict when to pull a bit.simulation is a powerful tool to enhance drilling performance and thereby reducing total drilling cost. in this paper the first 3 thousands feet of a reservoir lithology including four bit runs are simulated so that factors affecting penetration rate are optimized and the lowest possible well cost is achieved. the effects of using other bit types , weight on bit , rotary speed and bit hydraulics are simulated in an attempt to determine the optimized parameters , which result in the lowest drilling cost. overall it was found that in bit runs 2,3 and 4 a lower cost per foot can be achieved using milled tooth bits instead of tungsten carbide types.
Authors
mohsen ebrahimi
ACECR-production technology research institute