Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

Publish Year: 1397
نوع سند: مقاله ژورنالی
زبان: English
View: 187

This Paper With 53 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_RIEJ-7-3_001

تاریخ نمایه سازی: 30 فروردین 1400

Abstract:

Multi-criteria sequence dependent setup times scheduling problems exist almost everywhere in real modern manufacturing world environments. Among them, Sequence Dependent Setup Times-Multi-Objective Hybrid Flowshop Scheduling Problem (SDST-MOHFSP) has been an intensifying attention of researchers and practitioners in the last three decades. In this paper, we briefly summarized and classified the current standing of SDST-MOHFSP. All publications are categorized regarding the solution methods, as well as the structure of the hybrid flowshop which helps researcher and practitioner to use/modify proper solution algorithm for solving their specific problem. Furthermore, based on the review of the existing papers, the need for future research is recognized. Accordingly, by recognizing the research gaps, a large number of recommendations for further study have been proposed.

Keywords:

Multi-objective algorithms , hybrid flowshop scheduling , Sequence Dependent Setup Times , exact methods , heuristic and metaheuristic algorithms , Literature Review

Authors

F. Ghassemi Tari

Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran.

M. Rezapour Niari

Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • [1]     Abiri, M., Zandieh, M., & Tabriz, A. A. (2009). ...
  • [2]     Abyaneh, S. H., & Zandieh, M. (2012). Bi-objective hybrid ...
  • [3]     Acosta, J. H. T., González, V. A. P., & ...
  • [4]     Agnetis, A., Pacifici, A., Ross, F., Lucertini, M., Nicoletti, ...
  • [5]     Alaei, R., &  Ghassemi-Tari, F. (2011).  Development of a ...
  • [6]     Allahverdi, A., Ng, C., Cheng, T.E., Kovalyov, M.Y. (2008). ...
  • [7]     Allahverdi, A., & Aydilek, H. (2015). The two stage ...
  • [8]     Allahverdi, A, (2015). The third comprehensive survey on scheduling ...
  • [9]     Alfieri, A, (2009). Workload simulation and optimisation in multi-criteria ...
  • [10]  Amirian, H., Sahraeian, R. (2015). Augmented ε-constraint method in ...
  • [11]  Andrés, C., Albarracı́n, J. M., Tormo, G., Vicens, E., ...
  • [12]  Ashrafi, M., Davoudpour, H., & Abbassi, M. (2014). Investigating ...
  • [13]  Attar, S., Mohammadi, M., Tavakkoli-Moghaddam, R., Yaghoubi, S. (2014). ...
  • [14]  Azab, SS., & Hefny, HA. (2017). Swarm intelligence in ...
  • [15]  Barabási, B. A. L., & Bonabeau, E. (2003). Scale-free. ...
  • [16]  Behnamian, J., Zandieh, M., Fatemi Ghomi, S. M. T. ...
  • [17]  Behnamian, J., Fatemi Ghomi, S. M. T., & Zandieh, ...
  • [18]  Behnamian, J, Zandieh, M., & Fatemi Ghomi, S. M. ...
  • [19]  Behnamian, J., Fatemi Ghomi, S. M. T., & Zandieh, ...
  • [20]  Behnamian, J., Zandieh, M., & Fatemi Ghomi, S. M. ...
  • [21]  Behnamian, J., & Zandieh, M. (2011). A discrete colonial ...
  • [22]  Behnamian, J., Zandieh, M., & Fatemi Ghomi, S. M. T. ...
  • [23]  Behnamian, J., & Fatemi Ghomi, S.M.T. (2011). Hybrid flowshop ...
  • [24]  Behnamian, J., Fatemi Ghomi, S. M. T., & Zandieh, ...
  • [25]  Behnamian, J., & Zandieh, M. (2013). Earliness and tardiness ...
  • [26]  Behnamian, J., Fatemi Ghomi, S. M. T., & Zandieh, ...
  • [27]  Behnamian, J. (2014). Scheduling and worker assignment problems on ...
  • [28]  Blum, C., Roli, A., & Sampels, M. (2008). Hybrid ...
  • [29]  Blum, C., Puchinger, J., Raidl, G. R., & Roli, ...
  • [30]  Bonabeau, E., Dorigo, M., Theraulaz, G. (1999). Swarm intelligence: ...
  • [31]  Bozorgirad, M. A., & Logendran, R. (2016). A comparison ...
  • [32]  Brintha, N., Benedict, S., & Jappes, J. W. (2017). ...
  • [33]  Brown, S., McGarvey, R., & Ventura, J. (2004). Total ...
  • [34]  Burtseva, L, Yaurima, V, Parra, RR. (2010). Scheduling methods ...
  • [35]  Calvet, L., Armas, J. D., Masip, D., & Juan ...
  • [36]  Campbell, H. G., Dudek, R. A., & Smith, M. ...
  • [37]  Campos, S. C., Arroyo, J. E. C., & Tavares, ...
  • [38]  Campos, S. C., & Arroyo, J. E. C. (2014). ...
  • [39]  Chang, P. C., Hsieh, J. C., Wang, Y. W. ...
  • [40]  Chang, J., Yan, W., & Shao, H. (2004). Scheduling ...
  • [41]  Chang, P. C., Chen, S. H., Fan, C. Y., ...
  • [42]  Chiandussi, G., Codegone, M., Ferrero, S., & Varesio, F. ...
  • [43]  Cho, H. M., & Jeong, I. J. (2017). A ...
  • [44]  Choi, B. C., & Park, M. J. (2016). An ...
  • [45]  Ciavotta, M., Minella, G., & Ruiz, R. (2013). Multi-objective ...
  • [46]  Cochran, J. K., Horng, S. M., & Fowler, J. ...
  • [47]  Coello, C. A. C., Lamont, G. B., & Van ...
  • [48]  Crowder, B. (2006). Minimizing the makespan in a flexible ...
  • [49]  Dannenbring, D. G. (1977). An evaluation of flow shop ...
  • [50]  Davoudpour, H., & Ashrafi, M. (2009). Solving multi-objective SDST ...
  • [51]  Defersha, F. M. (2015). A simulated annealing with multiple-search ...
  • [52]  De Weck, O. L. (2004). Multiobjective optimization: History and ...
  • [53]  Dhingra, A. K., & Chandna, P. (2015). Hybrid genetic ...
  • [54]  Du, X., Ji, M., Li, Z., & Liu, B. ...
  • [55]  Ebrahimi, M., Fatemi Ghomi, S. M. T., & Karimi, ...
  • [56]  Eren, T. (2010). A bicriteria m-machine flowshop scheduling with ...
  • [57]  Eskandari, H., & Hosseinzadeh, A. (2014.) A variable neighbourhood ...
  • [58]  Fadaei, M., & Zandieh, M. (2013). Scheduling a bi-objective ...
  • [59]  Farahmand-Mehr, M., Fattahi, P., Kazemi, M., Zarei, H., & ...
  • [60]  Fattahi, P., Hosseini, S., & Jolai, F. (2013a). A ...
  • [61]  Fattahi, P., Hosseini, S., & Jolai, F. (2013b). Some ...
  • [62]  Fattahi, P., Hosseini, S., Jolai, F., & Tavakkoli-Moghaddam, R. ...
  • [63]  Frisch, A. M., Hnich, B., Kiziltan, Z., Miguel, I., ...
  • [64]  Fu, Y., Wang, H., Huang, M., Ding, J., & ...
  • [65]  Garey, M. R., & Johnson, D. S. (1979). Computers ...
  • [66]  Ghafari, E., & Sahraeian, R. (2014). A two-stage hybrid ...
  • [67]  Ghassemi-Tari, F., & Olfat, L. (2004). Two COVERT based ...
  • [68]  Ghassemi-Tari, F., & Olfat, L. (2007). Development of a ...
  • [69]  Ghassemi-Tari, F., & Olfat, L. (2008). Covert based algorithms ...
  • [70]  Ghassemi-Tari, F., & Olfat, L. (2010). A set of ...
  • [71]  Ghassemi-Tari, F. &  Alaei, R. (2013).   Scheduling TV commercials ...
  • [72]  Ghassemi-Tari, F., & Olfat, L. (2014). Heuristic rules for ...
  • [73]  Ghassemi Tari, F. & Hashemi Z. (2016). A priority ...
  • [74]  Ghassemi-Tari, F., & Meshkinfam, S. (2017). Improving performance of ...
  • [75]  Gicquel, C., Hege, L.,. Minoux, M., & Van, W. ...
  • [76]  Glover, F. (1977). Heuristics for integer programming using surrogate ...
  • [77]  Gholami, M., Zandieh, M., & Alem-Tabriz, A. (2009). Scheduling ...
  • [78]  Gholami S., & Rajaee Abyaneh F. (2016). Efficient algorithms ...
  • [79]  Gómez-Gasquet, P., Andrés, C., & Lario, F. C. (2012). ...
  • [80]  Guinet, A. (1991) Textile production systems: a succession of ...
  • [81]  Gupta, J. N. (1971). A functional heuristic algorithm for ...
  • [82]  Gupta J. N. (1979). A review of flowshop scheduling ...
  • [83]  Gupta, J. N., & Darrow, W. P. (1986). The ...
  • [84]  Gupta, D., Sharma, S., & Nailwal, K. K. (2012). ...
  • [85]  Ha, B. B., & Duc, N. N. (2013). Multiple ...
  • [86]  Haddad, M. N., Cota, L. P., Souza, M. J. ...
  • [87]  Hakimzadeh Abyaneh, S., & Zandieh, M. (2012). Bi-objective hybrid ...
  • [88]  Harbaoui, H., Bellenguez-Morineau, O., & Khalfallah, S. (2016). Scheduling ...
  • [89]  Hashemi, Z., & Tari, F. G. (2018). A Prufer-based ...
  • [90]  Hatami, S., Ebrahimnejad, S., Tavakkoli-Moghaddam, R., & Maboudian, Y. ...
  • [91]  Hatami, S., García, R. R., Romano, C. A. (2015). ...
  • [92]  He, D.W., Kusiak, A., & Artiba A. (1996). A ...
  • [93]  Hecker, F. T., Hussein, W. B., Paquet-Durand, O., Hussein, ...
  • [94]  Hecker, F. T., Stanke, M., Becker, T., & Hitzmann, ...
  • [95]  Hekmatfar, M., Ghomi, S. M. T., & Karimi, B. ...
  • [96]  Hendizadeh, S. H., ElMekkawy, T. Y., & Wang, G. ...
  • [97]  Hidri, L., & Gharbi, A. (2017). New efficient lower ...
  • [98]  Hosseini, S. M. H. (2016). Modeling the hybrid flow ...
  • [99]  Javadian, N., Amiri-Aref, M.,  Hadighi, A., Kazemi, M., & ...
  • [100]   Javadian, N., Fattahi, P., Farahmand-Mehr, M., Amiri-Aref, M., & ...
  • [101]   Jin, Z., Ohno, K., Ito, T., & Elmaghraby, S. ...
  • [102]   Johnson, S. M. (1954) Optimal two‐and three‐stage production schedules ...
  • [103]   Jolai, F., Sheikh, S., Rabbani, M., & Karimi, B. ...
  • [104]   Jolai, F., Rabiee, M., & Asefi, H. (2012). A ...
  • [105]   Juan, A. A., Lourenço, H. R., Mateo, M., Luo, ...
  • [106]   Jungwattanaki, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. ...
  • [107]   Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. ...
  • [108]   Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. ...
  • [109]   Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. ...
  • [110]   Kangarloo, N., Rezaeian, J., & Khosrawi, X. (2016). JIT ...
  • [111]   Karimi, N., Zandieh, M., & Karamooz, H. (2010). Bi-objective ...
  • [112]   Wang, H. (2005). Flexible flow shop scheduling: optimum, heuristics ...
  • [113]   Karmakar, S., & Mahanty, B. (2010). Minimizing makespan for ...
  • [114]   Kayvanfar, V., Komaki, G. M., Aalaei, A., & Zandieh, ...
  • [115]   Khalili, M., & Tavakkoli-Moghaddam, R. (2012). A multi-objective electromagnetism ...
  • [116]   Khalili, M., & Naderi, B. (2015). A bi-objective imperialist ...
  • [117]   Kia, H, Davoudpour, H, Zandieh, M. (2010). Scheduling a ...
  • [118]   Kia, H., Ghodsypour, SH., Davoudpour, H. (2017). New scheduling ...
  • [119]   Kianfar, K., Ghomi, S. M. T., & Jadid, A. ...
  • [120]   Komaki, M., Sheikh, S., Teymourian, E., & Malakooti, B. ...
  • [121]   Komaki, M., & Malakooti, B. (2017). General variable neighborhood ...
  • [122]   Kumar, A., & Dhingra, A. (2010). Minimization of total ...
  • [123]   Kurz, M. E. (2001). Scheduling flexible flow lines with ...
  • [124]   Kurz, M. E., & Askin, R. G. (2003). Comparing ...
  • [125]   Kurz, M. E., & Askin, R. G. (2004). Scheduling ...
  • [126]   Lee, S. M., & Asllani, A. A. (2004). Job ...
  • [127]   Lee, G. C., Hong, J. M., & Choi, S. ...
  • [128]   Lee, J. Y., & Bang, J. Y. (2016). A ...
  • [129]   Li, L, Wang, L, Huo, J.(2010). Hybrid flowshop scheduling ...
  • [130]   Li, X., & Li, M. (2015). Multiobjective local search ...
  • [131]   Li, X., Ma, S (2016) Multi-objective memetic search algorithm ...
  • [132]   Li, X, & Ma, S. (2017). Multiobjective discrete artificial ...
  • [133]   Lin, H. T., & Liao, C. J. (2003). A ...
  • [134]   Lin, S. W., & Ying, K. C. (2012). Scheduling ...
  • [135]   Liou, C. D., & Hsieh, Y. C. (2015). A ...
  • [136]   Liu, C. Y., & Chang, S. C. (2000). Scheduling ...
  • [137]   Lu, D., & Logendran, R. (2013). Bi-criteria group scheduling ...
  • [138]   Lu, C., Xiao, S., Li, X., & Gao, L. ...
  • [139]   Lu, C., Gao, L., Li, X., Pan, Q.K., & ...
  • [140]   Lu, C., Gao, L., Li, X., & Xiao, S. ...
  • [141]   Luo, H., Huang, G. Q., Zhang, Y., Dai, Q., ...
  • [142]   Luo, H., Zhang, A., & Huang, G. Q. (2015). ...
  • [143]   Lv, Y., Zhang, J., & Qin, W. (2017.) A ...
  • [144]   Maboudian, Y., & Shafaei, R. (2009). Modeling a bi-criteria ...
  • [145]   Majazi Dalfard, V., Ardakani, A., & Banihashemi, T. N. ...
  • [146]   Maleki-Darounkolaei, A., Modiri, M., Tavakkoli-Moghaddam, R., & Seyyedi, I. ...
  • [147]   Maleki-Daronkolaei, A., & Seyedi, I. (2013). Taguchi method for ...
  • [148]   Mansouri, S. A., Hendizadeh, S. H., & Salmasi, N. ...
  • [149]   Mastrolilli, M., & Svensson, O. (2011). Hardness of approximating ...
  • [150]   Mehravaran, Y., & Logendran, R. (2012). Non-permutation flowshop scheduling ...
  • [151]   Meshkinfam, S., Ghassemi, Tari F. (2016). A genetic algorithm ...
  • [152]   Michalewicz, Z. (1996). Heuristic methods for evolutionary computation techniques. ...
  • [153]   Miettinen, K., Mäkelä, M. M., & Kaario, K. (2006). ...
  • [154]   Miettinen, K., Molina, J., González, M., Hernández-Díaz, A., & ...
  • [155]   Minella, G., Ruiz, R., & Ciavotta, M. (2011). Restarted ...
  • [156]   Mirsanei, H., Zandieh, M., Moayed, M. J., & Khabbazi, ...
  • [157]   Mladenović, N., & Hansen, P. (1997). Variable neighborhood search. ...
  • [158]   Hansen, P., Oğuz, C., & Mladenović, N. (2008). Variable ...
  • [159]   Mohammadi, G. (2015). Multi-objective flow shop production scheduling via ...
  • [160]   Mousavi, S., Zandieh, M., & Amiri, M. (2011). An ...
  • [161]   Mousavi, S., Zandieh, M., & Amiri, M. (2012). Comparisons ...
  • [162]   Mousavi, S., & Zandieh, M. (2016). An Efficient Hybrid ...
  • [163]   Mousavi, S., Mahdavi, I., Rezaeian, J., & Zandieh, M. ...
  • [164]   Mousavi, S.M., Mahdavi, I., Rezaeian J., & Zandieh, M. ...
  • [165]   Mozdgir, A., Fatemi Ghomi, S. M. T., Jolai, F., ...
  • [166]   Naderi, B., Khalili, M., Taghavifard, M., & Roshanaei, V. ...
  • [167]   Naderi, B., Zandieh, M., & Fatemi Ghomi, S. M. ...
  • [168]   Naderi, B., Zandieh, M., Fatemi Ghomi, S. M. T. ...
  • [169]   Naderi, B., Zandieh, M., Balagh, A. K. G., & ...
  • [170]   Naderi, B., Zandieh, M., & Roshanaei, V. (2009a). Scheduling ...
  • [171]   Naderi, B., Ruiz, R., & Zandieh, M. (2010). Algorithms ...
  • [172]   Naderi, B., Gohari, S., & Yazdani, M. (2014). Hybrid ...
  • [173]   Nawaz, M., Enscore, E. E., & Ham, I. (1983). ...
  • [174]   Nayak A., Fang K., & Lee S. (2017). Demand ...
  • [175]   Nejati, M., Mahdavi, I., Hassanzadeh, R., & Mahdavi-Amiri, N. ...
  • [176]   Pan, Q. K., Gao, L., Li X. Y., & ...
  • [177]   Panahi, H. (2014). Two-stage flexible flow shop scheduling with ...
  • [178]   Palmer, D. (1965). Sequencing jobs through a multi-stage process ...
  • [179]   Patnaik, S., Yang, X. S., & Nakamatsu, K. (2017). ...
  • [180]   Pargar, F., & Zandieh, M. (2012). Bi-criteria SDST hybrid ...
  • [181]   Parveen, S., & Ullah, H. (2011). Review on job-shop ...
  • [182]   Pearn, W., Chung, S., Yang, M., & Chen, C. ...
  • [183]   Perez-Gonzalez, P., & Framinan, F. M. (2015). Assessing scheduling ...
  • [184]   Ponnambalam, S., Jagannathan, H., Kataria, M., & Gadicherla, A. ...
  • [185]   Qian, B., Wang, L., Huang, D. X., Wang, W. ...
  • [186]   Rabiee, M., Rad, R. S., Mazinani, M., & Shafaei, ...
  • [187]   Rahimi-Vahed, A., & Mirzaei, A. H. (2007). A hybrid ...
  • [188]   Rahmanidoust, M., Zheng, J., & Rabiee, M. (2017). Simultaneous ...
  • [189]   Rajaee Abyaneh, F., & Gholami, S. (2015). A comparison ...
  • [190]   Ramezani, P., Rabiee, M., & Jolai, F. (2015). No-wait ...
  • [191]   Ramezanian, R., Aryanezhad, M., & Heydari M. (2010). A ...
  • [192]   Ramezanian, R., Fallah Sanami, S., & Mahmoodian, V. (2017). ...
  • [193]   Rashidi, E., Jahandar, M., & Zandieh, M. (2010). An ...
  • [194]   Rezaeian, J., Seidgar, H., & Kiani, M. (2013). Scheduling ...
  • [195]   Ribas, I., Companys, R., & Tort-Martorell, X. (2017). Efficient ...
  • [196]   Ruiz, R., & Maroto, C. (2006). A genetic algorithm ...
  • [197]   Ruiz, R., Şerifoğlu, F. S., & Urlings, T. (2008). ...
  • [198]   Saluja, V., & Jain, A. (2014). Optimization of flexible ...
  • [199]   Samarghandi, H., & Behroozi, M. (2017). On the exact ...
  • [200]   Saravanan, M., Vijayakumar, S. J. D., & Srinivasan, R. ...
  • [201]   Satyanarayana, D., & Pramiladevi, M. (2016). Multi-criteria m-machine SDST ...
  • [202]   Satyanarayana, D., & Pramiladevi, M. (2017). Special heuristics for ...
  • [203]   Seidgar, H., Ezzati, M., Kiani, M., & Tavakkoli-Moghaddam, R. ...
  • [204]   Seidgar, H., Abedi, M., & Rad, S. T. (2015). ...
  • [205]   Seyedi, I., Maleki-Daronkolaei, A., & Kalashi, F. (2012). Tabu ...
  • [206]   Shabtay, D., & Oron, D. (2016). Proportionate flow-shop scheduling ...
  • [207]   Shahvari, O., Salmasi, N., & Logendran, R. (2009). A ...
  • [208]   Sharma, S., Gupta, D., & Nailwal, K. K. (2017a). ...
  • [209]   Sharma, S., Gupta, D., & Nailwal, K. K. (2017b). ...
  • [210]   Sheikh, S., Komaki, M., Teymourian, E., & Malakooti, B. ...
  • [211]   Sioud, A., Gagné, C., & Gravel, M. (2014a). Metaheuristics ...
  • [212]   Sioud, A., Gagné, C., & Gravel, M. (2014). Minimizing ...
  • [213]   Sioud, A., Gagné, C., & Dort, J. (2015). A ...
  • [214]   Sivapragasam, S., & Suppiah, Y. (2017). Minimizing Total Weighted ...
  • [215]   Song, J., Tang, J., Luo, X., & Liu, S. ...
  • [216]   Sukkerd, W., & Wuttipornpun, T. (2017). Non-population search algorithms ...
  • [217]   Tabrizi, A. A., Zandieh, M., & Vaziri, Z. (2009). ...
  • [218]   Tang, J., & Song, J. (2010). Discrete particle swarm ...
  • [219]   Tao, W., & Rongqiu, C. (2006). Heuristic algorithm of ...
  • [220]   Tavakkoli-Moghaddam R., & Safaei, N. (2007). A new mathematical ...
  • [221]   Tavakkoli-Moghaddam, R., Rahimi-Vahed, A., & Mirzaei, A.H. (2007). A ...
  • [222]   Tavakkoli-Moghaddam, R., Azarkish, M., & Sadeghnejad-Barkousaraie, A. (2011). A ...
  • [223]   Tavakkoli-Moghaddam, R., & Amin-Tahmasbi, H. (2012). A multi-objective immune ...
  • [224]   Taillard, E. (1993) Benchmarks for basic scheduling problems. European ...
  • [225]   Tian, H., Li, K., & Liu, W. (2016). A ...
  • [226]   Tyaghi, N., Seidgar, H., Abedi, M., & Chandramouli, A. ...
  • [227]   Urlings, T., Ruiz, R., & Serifoglu, F. S. (2010). ...
  • [228]   Vanchipura, R., Sridharan, R., & Babu, A. S. (2014). ...
  • [229]   Wang, H. S., Wang, L. C., Chen, T. L., ...
  • [230]   Wang, I. L., Wang, Y. C., & Chen, C. ...
  • [231]   Xiao, J., & Zheng, L. (2010). A MILP-based batch ...
  • [232]   Xu, J. Y., Dong, N. Q., & Gu, S. ...
  • [233]   Xu, Z. H., Li, J. M., & Gu, X. ...
  • [234]   Xu, J., Wu, C. C., Yin, Y., & Lin, ...
  • [235]   Yaurima, V., Burtseva, L., & Tchernykh, A. (2009). Hybrid ...
  • [236]   Yazdani, M., & Naderi, B. (2017). Modeling and scheduling ...
  • [237]   Yokoyama, M. (2001). Hybrid flow-shop scheduling with assembly operations. ...
  • [238]   Zandieh, M., Fatemi Ghomi, S. M. T., & Husseini, ...
  • [239]   Zandieh, M., & Rashidi, E. (2009). An effective hybrid ...
  • [240]   Zandieh, M., & Gholami, M. (2009). An immune algorithm ...
  • [241]   Zandieh, M., Dorri, B., & Khamseh, A. (2009). Robust ...
  • [242]   Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A ...
  • [243]   Zandieh, M., & Karimi, N. (2011). An adaptive multi-population ...
  • [244]   Zandieh, M., & Hashemi, A. (2015). Group scheduling in ...
  • نمایش کامل مراجع