TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 205

This Paper With 16 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JMAE-11-2_014

تاریخ نمایه سازی: 21 اردیبهشت 1400

Abstract:

In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a major percentage of the total project completion time. The contractors are required to have a better understanding of the initial phase of a project to provide better estimates in the bidding documents. While evaluating and shortening of this phase of low production is important for increasing the productivity and daily advance rate of the machine, there has been limited a direct study and assessment of this period. In this work, we discuss the parameters impacting LPP, and introduce a new methodology for its evaluation. In this regard, an algorithm is introduced for estimation of the approximate extent of LPP based on some TBM tunneling case histories. On the basis of many statistical analyses conducted on the actual data and application of two different shapes of linear and polynomial for the description of LPP, a linear function is proposed for estimation of the learning phase parameters. The major parameters of this function are the learning conditions’ rating and the proportion of LPP to tunnel diameter (X۱/D). Analysis of the correlation between these two parameters show a very good coefficient of determination (R۲ = ۹۲%). This function can be used for the evaluation of TBM advance rates in LPP and for adjusting the TBM utilization factor in the initial stages of a TBM tunneling project. The learning phase can affect the overall utilization rate and completion time of the tunnels, especially when their lengths are around a couple of kilometers. A true understanding of the LPP characteristics can help the contractors to come up with a more accurate bidding time and cost evaluation, and may also benefit the clients to arrange a better schedule for the final project delivery to the public.

Authors

E. Farrokh

Department of Mining and Metallurgy Engineering, Amirkabir University of technology, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Alvarez Grima, M. and P.A. (2000). Bruines and P.N.W. Verhoef, ...
  • Farrokh, E. (2013). Study of utilization factor and advance rate ...
  • Farrokh, E. (2020). A study of various models used in ...
  • Gong, Q.M. (2005). Development of a rock mass characteristics model ...
  • Hassanpour J., Rostami J. and Zhao J. (2011). A new ...
  • Hassanpour, J. (2009). Investigation of the effect of engineering geological ...
  • Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A. and Tavakoli, ...
  • Khademi Hamidi, J., Shahriar, K., Rezai, B. and Bejari, H. ...
  • Ramezanzadeh, A., Rostami, J. and Kastner, R. (2005). Influence of ...
  • Ribacchi, R, Lembo-Fazio, A. (2005). Influence of rock mass parameters ...
  • Abd Al-Jalil, Y. (1998). Analysis of performance of tunnel boring ...
  • Bieniawski, Z.T., Celada, B., Galera, J.M. and Tardáguila, I. (2008). ...
  • Khademi Hamidi, J., Shahriar, K., Rezai, B. and Bejari, H. ...
  • Laughton, C. (1998). Evaluation and Prediction of Tunnel Boring Machine ...
  • Ahuja, H.N. and Nandakumar, V. (1985). Simulation model to forecast ...
  • Farrokh, E., Rostami, J. and Laughton, Ch. (2011). Analysis of ...
  • Gratias, R., Allan, C. and Willis, D. (2014). The next ...
  • Maidl, B., Schmid, L., Ritz, W. and Herrenknecht, M. (2008). ...
  • Schmid, L. (2004). The development of the methodology of the ...
  • Wais, A., Wachter, R. (2009). Predicting the Learning Curve in ...
  • WBI-PRINT 6. (2007). Stability analysis and design for mechanized tunneling, ...
  • Rostami, J., Farrokh, E., Laughton, Ch., Eslambolchi, S.S. (2014). Advance ...
  • Brockway, J. (2016). EPB machines and interventions, Tunneling Short Course, ...
  • Bevis, F.W., Finniear, C. and Towill, D.R. (1970). Prediction of ...
  • Gutjahr, W.J., Katzensteiner, S., Reiter, P., Stummer, C. and Denk, ...
  • Jin, H., Thomas, B. W. and Hewit, M. (2016). Integer programming ...
  • Nembhard, D.A. and Norman, B.A. (2007). Cross Training in Production ...
  • Sayin, S. and Karabati, S. (2007). Assigning cross-trained workers to ...
  • Wais, A. (2002). Possibilities and Limitations of Predicting Tunnel Boring ...
  • Farrokh, E., Rostami, J. and Laughton, Ch. (2012). Study of ...
  • Sharp, W. and Ozdemir, L. (1991). Computer Modeling for TBM ...
  • US Army Corps of Engineers. (1997). Engineering and Design Tunnels ...
  • Rostami, J. (1997). Development of a force estimation model for ...
  • ITA/AITES WG. 14. (2000). Recommendations and Guidelines for Tunnel Boring ...
  • Bruland, A. (1998). Hard Rock Tunnel Boring. Ph.D. Thesis, Norwegian ...
  • Barton, N. (2000). TBM tunneling in jointed and faulted rock. ...
  • Bieniawski, Z. T., Celada, B., Galera, J.M. and Tardáguila, I. ...
  • Bieniawski, Z.T., Celada B. and Galera, JM. (2007). TBM excavability: ...
  • Bieniawski, Z.T., Celada, B. and Galera Fernandez, J.M. (2007). Predicting ...
  • Bieniawski, Z.T., Celada, B., Galera, J.M. and Álvares, M. (2006). ...
  • Bieniawski, Z.T. and Grandori R. (2007). Predicting TBM Excavability-Part II. ...
  • Fallahpour, M., Karami, M. and Sherizadeh, T. (2019). Double-shield TBM ...
  • نمایش کامل مراجع