A Numerical Investigation of TBM Disc Cutter Life Prediction in Hard Rocks
Publish place: Journal of Mining and Environment، Vol: 11، Issue: 4
Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 274
This Paper With 19 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JMAE-11-4_012
تاریخ نمایه سازی: 21 اردیبهشت 1400
Abstract:
There is a direct relationship between the efficiency of mechanized excavation in hard rocks and that of disc cutters. Disc cutter wear is an important effective factor involved in the functionality of tunnel boring machines. Replacement of disc cutters is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate, and has a major effect on the total time and cost of the tunneling projects. When these machines bore through hard rocks, the cutter wear considerably affects the excavation process. To evaluate the performance of the cutters, first, it is essential to figure out how they operate the rock cutting mechanism; secondly, it is important to identify the key factors that cause the wear. In this work, we attempt to introduce a comprehensive numerical method for estimation of disc cutter wear. The field data including the actual cutter wear more than ۱۰۰۰ pieces and the geological parameters along the Kani-Sib transmission tunnel in the northwest of Iran are compiled in a special database that is subjected to a statistical analysis in order to reveal the genuine wear rule. The results obtained from the numerical method indicate that with an increase in the wear of disk cutter up to ۲۵ mm, the applied normal and rolling forces can be multiplied by ۲.۹ and ۲.۷, respectively, and by passing the critical wear, the disk cutters lose their optimal performance. This method also shows that confining pressure will increase the wear of the disc cutter. By the proposed formulation, the cutter consumption rate can be predicted with a high accuracy.
Keywords:
Authors
M. Zahiri
Department of Mining Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
K. Goshtasbi
Department of Mining Engineering, Faculty of Engineering, Tarbiat Modares University, Tehran, Iran
J. Khademi Hamidi
Department of Mining Engineering, Faculty of Engineering, Tarbiat Modares University, Tehran, Iran
K. Ahangari
Department of Mining Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :