fuse shell: an innovation for coping with uncertainties in dam engineering

Publish Year: 1384
نوع سند: مقاله کنفرانسی
زبان: English
View: 930

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

SUADE01_009

تاریخ نمایه سازی: 15 آبان 1390

Abstract:

In View of water crisis in the world and economic considerations, impoundment of reservoirs during construction can be very important especially for large dams in developing countries. Using seasonal characteristics and forecasting models the first filling can be achieved after the flood season. But the spillway should be in service before the next flood season. In the course of a research on early impoundment of 165-m high Marun dam in Iran, an innovation appeared that would enhance the safety and flexibility of the first impoundment which is the most dangerous period in the life cycle of a dam. A thin concrete shell was proposed for plugging of diversion tunnel, which could readily be exploded if required to reverse the impoundment. The concrete shell was appropriately called fuse shell. The fuse shell would enhance the flexibility of the design especially in view of common uncertainties of water engineering. Unfortunately the fuse shell idea was not implemented for the first filling of Marun dam in March 1996. So when unexpected leakage of more then 7 m3/s occurred during the filling, the 10-m long concrete plug lacked the desired flexibility. The fuse shell could have saved the day. It could have ended the crisis in 2 or 3 days instead of 6 months. The probability of piping in the core, the delay in construction activities and the environmental damages to the fishes after the explosion of the gates could have been avoided. In practice, the first application of the fuse shell was in another Iranian dam, Godalandar on Karun River for the first impoundment in Dec. 2000. Unlike the Marun project, there was no need for explosion of the plug in the first impoundment of the Godalandar dam in December 2000. However, the existence of the fuse shell gave the owner and the consultants the assurance required for a safe and flexible impounding scheme.

Authors

K. EMAMI

JTMA Company, Tehran, Iran

B. KARAMPOOR

JTMA Company, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • ASCE Task Commmittee (1995), Alternative for Overtopping Protection of Dams, ...
  • Emami, K. (1998), "Fuse shell: _ innovation in dam Safety", ...
  • Emami, K. (2001), "Shelling _ Dam Safety", International Waterpower & ...
  • Emami, K., Agahi, M.A. and Samim, S.G. (2002), "Increasing safety ...
  • Falvey, H.T. (1995), "Hydraulics and design of fuse gates" , ...
  • Frederiksen, H.D. (1996), :Water crisis in developing world: misconc eptions ...
  • Hansen, K.D. (1992), :RCC for rehabilitation of dams in the ...
  • Hansen, K.D., Randall, B. (1999), :How old dam are reborn:, ...
  • Hydropower & Dams (1997), "Major CFRDs currently under construction worldwide", ...
  • ICOLD (2001), Nonstructurt Risk Reduction Measures; Benefits and Costs for ...
  • Jansen, R.B. (1988), Advanced Dam Engineering for Design, Construction, and ...
  • Kung, S.Y. (1993), Digital Neural Network, Englewood Cliffs: Prentice Hal ...
  • Lemperiere, F. (1993), :Dams that have failed by flooding: an ...
  • Mclean, F.D. (1993), "Roller compacted concrete for embankment overtopping protection", ...
  • Veltrop, J.A. (1996), :Future challenges in the sustainable uSe of ...
  • نمایش کامل مراجع