Abstract:

Up to recent decades a certain method was known for civil projects delivery, called D.B.B (Design- Bid-Build), that comprised of three parties: client (owner of the project and employer of other parties), engineer (responsible of design and technical affairs) and contractor (constructor of the project according to engineer’s expertise). In Iran Design-Build has gained a considerable attention in recent years as an implementation method for major civil projects. Design-Build offers some certain advantages to owners and in appropriate conditions can be expected to be a desirable method of implementing such projects in the future. This paper shows some of the uncertainties that must be addressed by owners and engineers working on behalf of owners, and in particular to address dam projects. In studies done on dam projects especially on disputes, we have explored the uncertainty regarding the project, categorizing in four items as below:

Authors

E. FORSATKAR

Senior Engineer, Mahabghodss Consulting Co., Tehran, Iran

E. RAJABI

K.N.Toosi University of Technology, Vanak Sq.,Tehran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Johannsen, H. and Nunn, J. (2002), "Design-Build project Delivery Challenges ...
  • FIDIC (2000), "Guide of FIDIC Conditions for D-B". ...
  • نمایش کامل مراجع