an investigation in to the instrumentation of the dam construction projects, a close-up on karun 3 dam and hepp

Publish Year: 1384
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,631

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

SUADE01_098

تاریخ نمایه سازی: 15 آبان 1390

Abstract:

The instrumentation of dams has found an important status in recent years in Iran. In large projects such as concrete and earthen dams the installation and monitoring of the instruments is an integral part of the project especially during construction and operation. Nowadays, no designer or project manager can insure the technical quality and related stabilities of the project in the absence of the instrumentations. Instrumentations are an important means to assess the state of the stability at various parts of the project. It is evident that the type of the instruments is based on the type of structures, geo-structures, technical, and execution conditions. The Karun 3 Dam is an important hydro electric power project of Iran. The project is comprised of the largest and most complicated double curvature concrete dam of the country, and possesses an important status worldwide. The underground powerhouse complex is also a giant project. Considering the large dimensions of the dam body, and the underground powerhouse complex with a power cavern of 251.10m x 25.43m x 47.70m (which is unique in the country), the instrumentation is an important issue. The instrumentation of the Karun 3 project, the processing of the results, and related interpretations are elaborated in the paper.

Authors

A. H. GHAZVINIAN

Faculty Member, Tarbiat Modarres University & Senior Geotechnical Advisor, IWPC, Tehran, Iran

A. R. KHOSHBORESH

Karun ۳ Dam & HEPP, Iran Water and Power Development Resources Co., Ministry of Energy, Tehran, Iran

Z. A. MORADIAN

Tarbiat Modarres University, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • review of geotechnical investigations of Karun3 HEPP , 5" Proceedings ...
  • Mahab Ghodss - Acers general partnership (1993), "Underground Powerhouse and ...
  • Mahab Ghodss - Acers (2002), _ _ strumentation progress reportc, ...
  • Mahab Ghodss - Acers (2004), "Impoundment Reportc , Karun3 development ...
  • Jansen, R.B. (1998), Advanced Dam Engineering for Design, Construction, and ...
  • نمایش کامل مراجع