Effective methods to reduce the pit wall displacement (Case study: Pars complex project)
Publish place: Journal of Geotechnical Geology، Vol: 13، Issue: 1
Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: English
View: 180
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JGEO-13-1_006
تاریخ نمایه سازی: 30 آبان 1400
Abstract:
The most important principles in deep excavation retaining structures are design and monitoring of the excavation wall displacement values. One of the best and most widely used methods of stabilizing the walls is using the anchorage and nailing systems. Shift in the excavation pit wall is very important because it can cause damage to adjacent buildings. To examine the effect of various approaches for simulation, northern wall with finite element software, Plaxis and Geoslope, was built using the methods of anchorage and nailing for examining the soil behavior and structural elements. Mohr-Coulomb is the most common constitutive model in numerical modeling with some weaknesses such as unrealistic heave of the excavation bottom and thus variations in the displacement field.
Keywords:
Authors
Masoumeh Mehrabi
Department of Geology, Science and Research Branch, Islamic Azad University, Tehran, Iran
Ali Uromeihy
Faculty of Basic Sciences,Tarbiat Modarres University, Tehran, Iran