Optimal Design of an Interruptible Load Program from the Viewpoint of an Industrial Customer

Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 103

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IECO-3-3_008

تاریخ نمایه سازی: 20 تیر 1401

Abstract:

The interruptible load program (ILP) is one of the most common demand response programs, which is often used by industrial customers. The purpose of implementing this program is to reduce the customer's peak demand in response to the incentives set by a contract. If no attention is paid to characteristics of the industrial customer's production process, the participation in ILP will not be possible. Therefore, complying with customer's technical constraints and optimal design of the program is of great importance. This study aims to present a new model for the optimal design of ILP from the perspective of a cement manufacturing company as an industrial customer. In this regard, the manufacturing process and the constraints of operation of a cement plant are fully modeled and all relevant constraints and requirements are considered. The objective function is the maximum profit, so the ILP is designed such that the cement plant's profit can be maximized without disrupting the normal performance of the production process. The proposed optimization problem is a mixed-integer non-linear one for which a suitable genetic algorithm is designed and used. In the proposed approach, the optimal incentive level is determined by assuming a specific budget level (related to the power company). The implementation of the proposed optimal design will satisfy the power system operator for reducing peak demand and the customer for earning more profit.

Authors

Mahdi Samadi

Department of Electrical and Computer Engineering, University of Hakim Sabzevari, Sabzevar, Iran

Karim Karami Nezhad

Department of Electrical and Computer Engineering, University of Hakim Sabzevari, Sabzevar, Iran

Elahe Zakikhani

Department of Electrical and Computer Engineering, University of Hakim Sabzevari, Sabzevar, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • M. Ortega, C. Bel C, G. Escrivá, and A. Domijan, ...
  • S. Esmailnajad, J.Sundquist, “Demand Side Management in Swedish Indutry,” M.S. ...
  • H. Safari Faramad, H. Rajabi Mashhadi, “Real modeling of Great ...
  • M. Paulus, F. Borggrefe, “The potential of demand-side management in ...
  • N. Shamloo, M. Aras Nezhad, “The feasibility of using interruptible ...
  • H.A. Aalami, M.P. Moghaddam, and G.R. Yousefi GR. “Demand response ...
  • M.W. Leinmiller, “Total power management for the cement Industry”, Cement ...
  • W. Niu, Y. Li, “Uncertain optimization decision of interruptible load ...
  • J.R García, C.A. Bel, M.A. Ortega, and E.P. Lopez, “A ...
  • X. Wang, N.H. El-Farra, and A. Palazoglu, “Optimal scheduling of ...
  • C.A. Bel, et al. “Technical and economical tools to assess ...
  • H. Safari farmad, H. Rajabi Mashhadi, and S. Biglar, “Risk ...
  • M. Rahmani-andebili, “Modeling nonlinear incentive-based and price-based demand response programs ...
  • M. Rahmani-Andebili, “Nonlinear demand response programs for residential customers with ...
  • R. Deng, et al. “A survey on demand response in ...
  • S. Mohajeryami, Saeed, “A novel economic model for price-based demand ...
  • H.Izad khasti, R.Kipour, “Planning optimal demand response of Electricity Demand ...
  • S. Sorkhani, S. Suleimani, and B. Mozafari, "Strategic bidding for ...
  • Hong Hu, et al., “Research on Peak Load Optimization Model ...
  • J. Zhang, P. Zhang, H. Wu, X. Qi, S. Yang ...
  • A. Aryandoust, J. Lilliestam,”The potential and usefulness of demand response ...
  • X. Jian, L. Zhang, X. Miao, Y. Zhang, and X. ...
  • M. Bastani, A.E. Thanos, H. Damgacioglu, N. Celik, and C.H. ...
  • M. Habibian, G. Zakeri, A. Downward, et al., “Co-optimization of ...
  • A. Conteh, M.E. Lotfy, K.M. Kipngetich, T. Senjyu, P. Mandal, ...
  • M. Samadi, M. Aghamohamadi, A. Mahmoudi, “Optimal time period clustering ...
  • M.W. Leinmiller, “Total power management for the cement industry,” in ...
  • M. Zarif, M. H. Javidi, M. S. Ghazizadeh, "Self-scheduling of ...
  • Practical approach for planning of reliability-centered maintenance in distribution network with considering economic risk function and load uncertainly [مقاله ژورنالی]
  • Torque Ripple Minimization in SRM Based on Advanced Torque Sharing Function Modified by Genetic Algorithm Combined with Fuzzy PSO [مقاله ژورنالی]
  • A.M. Bod, “An Analysis of the Cement Industry at the ...
  • نمایش کامل مراجع