Claim Reserve Estimation Using Double Chain Ladder Method

Publish Year: 1401
نوع سند: مقاله ژورنالی
زبان: English
View: 96

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJIEPR-33-4_014

تاریخ نمایه سازی: 29 آبان 1401

Abstract:

One of the problems faced by insurance companies, especially for the business class that has a long tail, is the length of the claim settlement period until the claim is paid off because there are procedures that must be carried out, such as analyzing and justifying the claims submitted. The claims that are still in the process are divided into two, namely claims that reported but have not been settled (RBNS) and claims that incurred but have not been reported (IBNR). One method that is often used in estimating claim reserves is the Chain Ladder Method. However, this method is only able to estimate the IBNR claim reserve. In ۲۰۱۲, Martinez-Miranda, Nielsen, and Verrall developed a method that can generate predictions of claim reserves for IBNR and RBNS separately, namely the Double Chain Ladder method. This study aims to calculate the estimated reserves for claim using Double Chain Ladder (DCL) method. From the calculation results, it is found that the Double Chain Ladder (DCL) method can estimate the IBNR and RBNS claim reserves clearly and separately with a total estimated RBNS claim reserve is ۱۰۱.۴۹۲,۷۹۲ (in million rupiahs) and the estimated IBNR claim reserve is ۲۹.۱۷۲,۸۸۰ (in million rupiahs).  

Authors

Ayunda Anisa Soleha

۲. Actuarial and Insurance Administration Study Program, Vocational Education Program Universitas, Indonesia

Yulial Hikmah

۳. Actuarial and Insurance Administration Study Program, Vocational Education Program Universitas, Indonesia