Proposing a lower bound for a nonlinear scheduling problem in supply chain
Publish Year: 1400
Type: Journal paper
Language: English
View: 178
This Paper With 13 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
JR_IJNAA-12-1_085
Index date: 2 December 2022
Proposing a lower bound for a nonlinear scheduling problem in supply chain abstract
This paper proposes a nonlinear programming model for a scheduling problem in the supply chain. Due to the nonlinear structure of the developed model and its NP-hard structure, a lower bound is developed. Four lemmas and a theorem are presented and proved to determine the lower bound. The proposed problem is inspired from a three stage supply chain commonly used in various industries.
Proposing a lower bound for a nonlinear scheduling problem in supply chain Keywords: