Preliminary study on influence of perforation diameters on wellbore productivity

Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,162

This Paper With 5 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICCE09_714

تاریخ نمایه سازی: 7 مهر 1391

Abstract:

Perforations are mostly common among the water wellbore projects in Iran. These perforations have significant improvement on wellbore productivity. Considering the remarkable effects perforations have on wellbore productivity, further optimization in perforations parameters is needed. One of the important parameters is the measurement of water head and seepage velocity. In this paper, the effects of changes in perforation diameter on both water head and seepage velocity were studied. The constant head and constant discharge experiments in different conditions were modeled in SEEP 3D. It is observed that changing the perforations diameter is an appropriate tool in groundwater head loss adjustment and velocity of seepage regulation. Results show that ground type influences the head loss but not the velocity of seepage.

Authors

Abolfazl Shamsai

Full professor, Civil Engineering

Zahra Zangeneh-madar

Ph.D Student, Département de génie de la construction, École de technologie supérieure(ÉTS

Ammar Mirzayee

Master of Science Student,