Ranking business processes maturity by modified rembrandt technique with considering CMMI dimensions

Publish Year: 1395
نوع سند: مقاله ژورنالی
زبان: English
View: 90

This Paper With 20 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JIJMS-9-3_006

تاریخ نمایه سازی: 6 شهریور 1402

Abstract:

An organization’s value is substantiated by consistent, high quality processes engineered in its operations and the allocation of the limited resources to achieve the desired objective. Intrinsic to the development of a process are the articulation of a coherent workflow, identification of the optimal skillset required at each stage of the process, and commissioning of the right technology platform. However, processes need to evolve with perceptible changes in the customer mindset, new technologies, exponential growth needs, and the unrelenting pressure on cost reduction. More than ever, organizations today need to institutionalize continual process improvement to avoid the risk of receding into obsolescence. While organizations choose from a menu of process improvement models, it is important to assess the maturity of the end-to-end process and to identify potential gaps and tailored solutions critically and in order. The purpose of this paper is to evaluate and rank the maturity of processes in a consulting firm. To achieve this goal, a review of the literature related to the organization’s process maturity models is provided and thereafter a comprehensive model including factors and confirmed indicators is presented. It continues to assess and discuss the maturity of processes in a consulting firm.

Keywords:

Business Process Maturity Models , Process management , Rembrandt Techniques

Authors

احمد جعفرنژاد چاقوشی

Faculty of Management, University of Tehran, Tehran, Iran

محسن مرادی مقدم

Faculty of Management, University of Tehran, Tehran, Iran

سهیلا اعتضادی

Faculty of Management, University of Tehran, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Barzilai, J., Cook, W., & Golany, B. (۱۹۸۷). Consistent weights ...
  • Belton, V., & Stewart, T.J. (۲۰۰۲). Multiple Criteria Decision Analysis: ...
  • De Bruin, T., Rosemann, M., Freeze, R., & Kulkarni, U. ...
  • Estampe, D., Lamouri, S.,& BrahiDjellou, S.(۲۰۱۳). "A framework for analyzing ...
  • Fisher, D.M. (۲۰۰۴). The business process maturity model: a practical ...
  • Fraser, P., Moultrie, J.,& Gregory, M. (۲۰۰۲). The use of ...
  • Gottschalk, P. (۲۰۰۹). Maturity levels for interoperability in digital government. ...
  • Hammer, M. (۲۰۰۷). The Process Audit. Harvard Business Review, ۸۵(۴), ...
  • Harmon, P. (۲۰۰۴). Evaluating an Organization’s Business Process Maturity. Business ...
  • Iversen, J., Nielsen, P.A.,& Norbjerg, J. (۱۹۹۹). Situated Assessment of ...
  • Kazanjian, R.K., & Drazin, R. (۱۹۸۹). An Empirical Test of ...
  • Kuznets, S. (۱۹۶۵). Economic Growth and Structure, Heinemann Educational Books, ...
  • Lee, J., Lee, D., & Sungwon, K. (۲۰۰۷). An Overview ...
  • Lockamy III, A., & McCormack, K. (۲۰۰۴). The development of ...
  • Løken, E. (۲۰۰۷). Use of multicriteria decision analysis methods for ...
  • Lootsma, F. A. (۱۹۹۲).The Rembrandt system for multi-criteria decision analysis ...
  • Lootsma, F. A. (۱۹۹۳). Scale sensitivity in the multiplicative AHP ...
  • Lootsma, F. A. & Bots, P. W. G. (۱۹۹۹). The ...
  • Maull, R.S., Tranfield, D.R. & Maull, W. (۲۰۰۳). Factors characterizing ...
  • McCormack, K., & Johnson, W. (۲۰۰۱). Business Process Orientation: Gaining ...
  • Moradi-Moghadam, M., Safari, H., & Maleki, M. (۲۰۱۳). A novel ...
  • Nolan, R.L. (۱۹۷۳). Managing the computer resource: a stage hypothesis. ...
  • Nolan, R.L. (۱۹۷۹). Managing the crisis in data processing. Harvard ...
  • Olson, D.L., Fliedner, G., & Currie, K. (۱۹۹۵). Comparison of ...
  • Prananto, A., Mckay, J., & Marshall, P. (۲۰۰۳). A study ...
  • Reyes,H.G., & Giachetti,R. (۲۰۱۰). Using experts to develop a supply ...
  • Roeglinger, M., Poeppelbuss, J., & Becker, J. (۲۰۱۲). Maturity models ...
  • Rohloff, M. (۲۰۰۹). An approach to assess the implementation of ...
  • Rosemann, M., de Bruin, T., & Power, B. (۲۰۰۶). A ...
  • Rosemann. M., de Bruin. T., & Hueffner, T. (۲۰۰۴). A ...
  • Rosemann, M., & de Bruin, T. (۲۰۰۵). Towards a business ...
  • Rummler, G.,& Brache, A. (۱۹۹۰). Improving Performance: How to Manage ...
  • Saaty, T. L. (۱۹۷۷). Scenarios and priorities in transport planning: ...
  • Van den Ven, A.H., & Poole, M.S. (۱۹۹۵). Explaining development ...
  • Weber, C., Curtis, B. & Gardiner, T. (۲۰۰۸). Business Process ...
  • نمایش کامل مراجع