سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Benefits of cooperation between the supplier and manufacturer to minimize the sum of flow times in a supply chain

Publish Year: 1386
Type: Conference paper
Language: English
View: 2,342

This Paper With 17 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

IIEC05_170

Index date: 13 November 2006

Benefits of cooperation between the supplier and manufacturer to minimize the sum of flow times in a supply chain abstract

The aim of this paper is to study one of the classical scheduling objectives to minimizethe sum of flow times, in the context of a supply chain network. Let's consider a situation that a supplier schedules a set of jobs for delivery in batches to several manufacturers, who in turn has to schedule and deliver jobs in batches to several customers. The personal problem from the viewpoint of supplier and manufacturers will be addressed separately. The decision problem faced by the supplier is to minimize the sum of flow time and delivery cost of a set of jobs to be processed on a single machine for delivery in batches to manufacturers. The problem on the side of manufacturer is similar to the supplier’s problem and the only difference is the scheduling, batching and delivery decisions made by the supplier to define a release date for each job, before the manufacturer cannot start the processing of that job. A combined problem in the light of cooperation between the supplier and manufacturer will be addressed as well. The objective of the combined problem is to find the best scheduling, batching, and delivery decisions that benefit the entire system including the supplier and manufacturer. Computational experience shows that cooperation between a supplier and a manufacturer reduces the total system cost of up to 12.35%, while theoretically the reduction of upto 20% can be achieved in special cases.

Benefits of cooperation between the supplier and manufacturer to minimize the sum of flow times in a supply chain Keywords:

Benefits of cooperation between the supplier and manufacturer to minimize the sum of flow times in a supply chain authors

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
Vidal, C.J. & Goetschalckx, M. (1997) Strategic pro duc tion ...
Weng, Z.K. Pricing and ordering strategies in manu facturing and ...
Weng, Z.K. (1999) The Power of coordinated decisions for short-life ...
S armiento , A.M. & Nagi, R. (1999) A review ...
Erenguc, S.S., S impson, N.C., & Vakharia, A.J. (1999) Integrated ...
Croom, S., Romano, P., & Giannakis , M. (2000) Supply ...
Krajewski, L. & Wei, J.C. (2005) The value of production ...
Lee, Y.H. & Kim, S.H. (2002) Production -distribution planning in ...
Chen, I.J. & Paulraj A. (2004) Towards a theory of ...
Elmahi, I., Merzouk, S., Grunder, O., & Elmoudni, A. A ...
Hall, N.G. & Potts, C.N. (2003) Supply chain scheduling: Batching ...
Webster, S. & Baker, K.R. (1995) Scheduling Groups of Jobs ...
Potts, C.N. & Kovalyov, M.Y. (2000) Scheduling with batching: A ...
Albers, S. & Brucker, P. (1993) The Complexity of One-Machine ...
Cheng, T. C.E., Gordon, V.S., & Kovalyov, M .Y. (1996) ...
Mazdeh, M .M., Sarhadi, M., & Hindi, K.S. A branch ...
Lenstra, J.K., Rinnooy Kan, A.H.G., & Brucker, P. (1977) Complexity ...
Baker, K. (1974) introduction to sequencing and scheduling. John Wiley ...
Smith, W.E. (1956) Various optimizers for single stage production. Naval ...
Chu, C.B. (1992) Efficient Heuristics to Minimize Total Flow Time ...
Dessouky, M .I. & Deogun, J.S. (1981) Sequencing Jobs with ...
Deogun, J.S. (1983) On Scheduling with Ready Times to Minimize ...
Bianco, L. & Ricciardelli, S . (1982) Scheduling of A ...
Dyer, M.E. & Wolsey, L.A. (1990) Formulating the single machine ...
Belouadah, H. _ Posner, M.E., & Potts, C.N. (1992) Scheduling ...
Hariri, A.M.A. & Potts, C.N. (1983) An algorithm for single ...
Mahdavi Mazdeh, M., Sarhadi, M., & Hindi, K.S. A branch-and ...
Garey, M.R., Johnson, D.S., & Sethi, R. (1976) The complexity ...
Ignall, E. & Schrage, L. (1965) Application of the branch ...
Van De Velde, S.I. (1990) Minimizing the Sum of job ...
De llaCroce, F., Narayan, V., & Tadei, R. (1996) The ...
De llaCroce, F., Ghirardi, M., & Tadei, R. (2002) An ...
Akkan, C. & Karabati, S. (2004) The two-machine flowshop total ...
Mahdavi Mazdeh M. Minimizing the sum of flow times with ...
Pinedo, M. (1995) Scheduling Theory, Algorithms, and systems. Prentice-Hal. Inc.. ...
نمایش کامل مراجع