Knowing the effective parameters in the evaluation of investment methods, contracting andknowing the contractor for the infrastructure development of urban construction projects inmarginal areas using the multi-criteria decision-making method AHP

Publish Year: 1402
نوع سند: مقاله کنفرانسی
زبان: English
View: 30

This Paper With 23 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICSAU09_088

تاریخ نمایه سازی: 24 فروردین 1403

Abstract:

In order to reach the decision point for investment, an investor must ensure the profitability of his activity andthe preservation of ownership and non-infringement of his capital. Before allocating his capital for investment,the investor evaluates his future profit and loss, so that he decides to allocate his resources to what activitieswill have the maximum return in the entire period of the project's activity. From this point of view, financialcomponents are effective in the type of investment. This means that the future vision indicates capital securityand financial stability; The investor will move towards physical and long-term investment, and in case ofinsecurity of investment and financial instability, service, hoarding and trading investments will be formed.Easy and low-cost access to production factors, including financial resources, strategic foundation (identifyingexisting and potential opportunities and explaining strategies for using opportunities and turning threats intoopportunities) and amending or abolishing laws and regulations that interfere with investment, including thecomponent The other is the entry of investors into production sectors. In this regard, the present research wasconducted based on library studies and the opinion of experts in the construction industry in Shiraz. Theinformation obtained was weighted using Expert Choice software, and finally, using the multi-criteria AHPmethod, among the five strategies to reduce construction costs using value engineering, the parameter"employer's financial deficiency" was given the highest priority. .

Authors

Hossein Khademi

Sc Student in Civil Engineering, Construction Management, Faculty of Engineering, Shiraz Branch,Islamic Azad University, Shiraz, Iran

Mohammad Amir Sharafati,

Assistant Professor, Department of Civil Engineering, Faculty of Engineering, Shiraz Branch, IslamicAzad University, Shiraz, Iran