Assessment of TBM and D&B Based on Excavation Time and Costs
Publish place: 3rd Iranian Rock Mechanics Conference
Publish Year: 1386
Type: Conference paper
Language: English
View: 2,882
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
IRMC03_177
Index date: 4 February 2007
Assessment of TBM and D&B Based on Excavation Time and Costs abstract
By means of the latest NTNU prediction models for time and costs, the productivity and efficiency of the TBM and D&B options have been investigated. The weekly advance rate and unit excavation costs as a function of rock conditions and tunnel geometry are presented. As a result, the efficient and cost effective method for a tunnel is subject to mainly rock conditions, tunnel cross section area, length and tunnel application. Under Norwegian costing, for hard rock (poor boreability), the D&B method is cost effective whereas in small and long tunnels with good boreability the cost associated to the TBM is lower. Generally, the TBM has higher advance rate, and the rock conditions has a substantial impact on the TBM performance and costs.
Assessment of TBM and D&B Based on Excavation Time and Costs Keywords:
Assessment of TBM and D&B Based on Excavation Time and Costs authors
Shokrollah Zare
Department of Civil and Transport Engineering, Norwegian University of Science and Technology, NTNU, Trondheim, Norway
Amund Bruland
Department of Civil and Transport Engineering, Norwegian University of Science and Technology, NTNU, Trondheim, Norway
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :