Crossing of Fault Zones in the MFS Faido by Using the Observational Method abstract
The presentation deals with the crossing of severe fault zones in the multifunctional station Faido (MFS Faido), part of the Gotthard Base Tunnel,
located in Switzerland. During the excavation work of the MFS Faido large, not prognosticated fault zones were found. Their impact on the layout and the tunnel support is described. Therefore the excavation procedure and the support system were specified over the combination of geotechnical computations and the observational method. By using both the severe fault zones in the MFS Faido could be crossed successfully.
Crossing of Fault Zones in the MFS Faido by Using the Observational Method authors
Stadelmann
Amberg Engineering Ltd, Switzerland
Wenner
Amberg Engineering Ltd, Switzerland
Wannenmacher
Amberg Engineering Ltd, Switzerland
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :