Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches
Publish Year: 1394
نوع سند: مقاله ژورنالی
زبان: English
View: 473
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-28-6_010
تاریخ نمایه سازی: 15 آذر 1394
Abstract:
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material orderingplans to minimize material costs. In this paper, the RCPSP incorporated with the material ordering problem is first formulated into a NP-hard optimization model. Then, two hybridized meta-heuristicalgorithms are proposed to solve the integrated problem. In addition, statistical methods are employedto tune the parameters of both algorithms. Finally, computational results for a set of test problems taken from the project scheduling problem library (PSPLIB) are presented
Keywords:
Authors
N Zoraghi
Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
A.A Najafi
Department of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran
S.T.A Niaki
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran