Delay Analysis Methods in Construction Projects
Publish place: اولین کنفرانس تخصصی مهندسی مدیریت ساخت وپروژه
Publish Year: 1393
نوع سند: مقاله کنفرانسی
زبان: English
View: 973
This Paper With 13 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
NCCPM01_008
تاریخ نمایه سازی: 27 بهمن 1394
Abstract:
Delays are one of the biggest problems construction firms face. Delays may lead to many negative effects such as claim between owners and contractors. This has made it quite imperative for contracting parties to analyse project delays for purposes of making right decisions on potential time and/or cost compensation claims. While there are many variations on the themes, all of the commonly applied forensic delay analysis techniques generally conform to one of the following primary categories: Impacted As-Planned, Collapsed As-Built, As-Planned versus As-Built, Time Impact Analysis. This paper provides a short explanation of all of the above methods
Keywords:
Authors
Azade Asaadi
Allaodoleh Semnani Institute of Higher Education
Massoumeh Taslimi
Allaodoleh Semnani Institute of Higher Education
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :